Two Decades of Sustainability Leadership
Decarbonization Plan (Phase 2)
UMass Amherst hired consultants to develop a plan to further decarbonization efforts, assess Scope 3 emissions, and engage the campus community. To learn more about this process, visit Our Path to Carbon Zero.
Heat Pump Grant Awarded
UMass Amherst received a $7.35 million grant from the Massachusetts Department of Energy Resources Decarbonization Implementation Grant Program (DIG). The heat pump was designed to capture waste heat from the existing power plant, reducing Scope 1 emissions by 11.2 percent. Read more about the Heat Pump Grant Award.
North Energy Exchange Center (NEEC) Expansion with Geo-Exchange and Thermal Energy Storage
The North Energy Exchange Center (NEEC) expansion, completed in 2026, includes a Thermal Energy Storage tank and Heat Recovery Chillers. The NEEC is also connected to a geo-exchange bore field in Lot 31 that has 70 bores, each 800 feet deep. The NEEC serves the campus hot water loop connected to the Sustainable Engineering Lab (SEL) and Computer Science Lab (CSL).
Computer Science Lab: First LEED Platinum Building in UMass System
The Computer Science Lab (CSL) opened in 2026, the first of its kind in the UMass system. Read more about the Computer Science Lab (CSL) here.
Campus Electrification Plan
This study quantified the impacts of additional projects on the campus electrical grid and recommended upgrades. Learn more about energy storage.
For the Common Good: Strategic Plan
Chancellor Reyes identified sustainability as one of seven values in the campus strategic plan. Read more about the UMass For the Common Good: Strategic Plan.
Heating System Decarbonization Plan
This study evaluated alternative heating technologies that could be deployed at the Central Heating Plant (CHP). Learn more about the CHP.
Demolition of Inefficient Buildings
UMass Amherst has reduced campus square footage and related energy consumption by decommissioning and demolishing older, inefficient buildings that no longer serve our program needs. Recent demolitions include Hatch Lab, Draper Annex, Chapman, Mallow, North Village, Lincoln Apartments, Art Barn, and Agricultural Engineering Annexes A&B.
Electric Vehicle Charging Stations
To electrify UMass's fleet and further drive down Scope 1 emissions, 15 level 2 & 3 EV chargers have been installed across campus. In addition, electric lawn mowers were purchased to reduce fossil fuel usage for grounds maintenance activities. UMass Amherst partnered with PVTA to purchase an electric bus for local transportation. Read more about the electric bus here.
Chancellor Subbaswamy Announces “UMass Carbon Zero” Vision
On Earth Day 2022, UMass launched UMass Carbon Zero, an ambitious campaign that set a course toward reaching net-zero carbon emissions at UMass Amherst. Read more about Chancellor Subbaswamy's announcement.
Renewable Fuel Oil Research
Massachusetts Executive Order 594 sets ambitious reduction targets for fuel oil use. At the CHP, Boiler 500 was installed with a special burner capable of using renewable fuel oil (RFO). To date, emissions testing has been completed on three types of RFO.
Carbon Mitigation Plan
This plan addressed many areas of carbon reduction and led to the following projects:
- North Energy Exchange Center
- Energy Command Center
- Building Automation Systems
- Electrical upgrades
- 2.2-million-gallon thermal storage tank
- Four-hour-capacity battery storage units
- And more mitigation projects
Electrification of New and Renovated Buildings
UMass committed to electrifying all new construction and major renovations in compliance with Massachusetts Executive Order 594 (EO594). Since EO594 took effect, several capital projects have met this mandate including CSL, SEL, the SPHHS Hub, Flint Lab, Fieldstone, University Village, and Memorial Hall.
Energy Efficiency Projects: Retro-Commissioning and LED Lighting
Retro-commissioning is like a "building reset" that adjusts controls back to the original design intent, which often optimizes operation and saves energy. Over 20 buildings on campus have received LED lighting retrofits. This $16 million investment in existing campus buildings reduced heating, cooling, and electricity needs.
"Shut the Sash" Program Initiated
This program began in the Physical Science Building's wet lab spaces to reduce energy use.
Electric Battery Storage
In 2018, a 3.3 MW Battery Energy Storage System (BESS) was installed at the CHP. In 2022, a 1.32 MW battery was installed in Lot 22. These batteries charge when electric rates are low or there is an excess of solar PV production. They discharge electricity when rates are high, or solar energy is not available. A third BESS is planned for installation in 2027.
Sustainability Integration Project
The Chancellor's Sustainability Advisory Committee (CSAC) identified six top strategic priorities for advancing sustainability through a planning process called the Sustainability Integration Project (SIP). Read the outcomes of the Sustainability Integration Project.
Absorption to Electric Chiller Conversions
In 2016, UMass started switching from steam absorption chillers to electric chillers in various buildings, including Mullins (2025), Goodell (2022), and Berkshire Dining (2016).
Comprehensive Campus Energy Plan
The plan provided the campus with a long-range vision for efficient and reliable utility generation and delivery, as well as effective energy conservation measures. Although the plan was based on a 50-year period, specific recommendations and upgrades were presented to address short-term needs associated with the 10-year capital plan. Read the 2015 Comprehensive Campus Energy plan.
Additional Solar Photovoltaic (PV) Arrays Installed on Campus
UMass entered into a campuswide Power Purchase Agreement (PPA) in 2015 and installed solar PV arrays on Parking Lots 25 & 44 as well as five building rooftops. Since then, solar PV arrays have been installed on three more parking lots, one additional building, and an agrivoltaics system at Deerfield Farm. In 2026, a solar PV array will be installed on Lot 28 and multiple rooftops at the Charles River Campus. Read more about solar at UMass.
First Solar PV Installation at UMass
The former Robsham Visitor Center parking lot was the first parking lot to receive solar canopies with a grant from DOER.
Solar Energy Plan
Campus Sustainability Manager Ezra Small created a solar energy plan for the core campus area, evaluating multiple installation types, including ground-mounted systems, roof-mounted systems, and parking lot canopies. Read more about the Solar Energy Plan.
UMass Amherst Climate Action Plan
This climate action plan examined campus operations, culture, and academics to develop strategies for reducing carbon emissions. Read the UMass Amherst Climate Action Plan.
LEED Certification from Executive Order 484
Executive Order 484 (EO 484) specified that any new building or major renovation must be LEED Silver certified or better. Currently, UMass Amherst has over 2 million square feet of LEED certified facilities.
Energy Service Contract with Johnson Controls
This contract helped establish a controls program and launched a new era of energy conservation projects, aiming for continuous improvement and commissioning. Since 2005, JCI has implemented over 38 energy conservation projects worth $40 million. Read more about the energy service conservation project here.