1. What are river corridors and why are they important?

ANR River Corridors encompass the area of land surrounding a river that provides for the meandering, floodplain, and the riparian functions necessary to restore and maintain the naturally stable or least erosive form of a river thereby minimizing erosion hazards over time.  They are mapped using calculations that rely on in-field and map based measurements. Lands within and immediately abutting a river corridor are at higher risk to fluvial erosion. Giving rivers room to move is critical in avoiding the stream armoring and berming measures used to protect within-corridor development that so often leads to increases in erosion upstream and downstream and adversely affects public safety, riparian landowners, and river ecosystems.

2. How does the State manage river corridors?

The Vermont General Assembly has directed the ANR to delineate river corridors and provide them as advisory to all municipalities. The river corridor map will serve to inform ANR regulatory, planning, and conservation programs. The DEC is finalizing a draft of its Flood Hazard Area and River Corridor Protection Procedure that details how the river corridor map is: created and disseminated; used for state regulatory actions and recommendations; and how it may be updated or administratively revised with improved data and municipal planning. Answers to these frequently asked questions concerning river corridors, river corridor planning, and the map refinement process are offered as further explanation.

3. Are river corridors new, what about FEH areas?

The ANR began delineating fluvial erosion hazard (“FEH”) areas as part of its stream geomorphic assessments in 2002. Following the 2003 Vermont Supreme Court decision in the Woodford-Packers case, the ANR Secretary began delineating FEH areas using an adopted procedure as part of the Act 250 criterion 1(D) floodway determinations. The term “river corridor” came into use in 2007 when the Agency began evaluating assessment data to identify restoration and protection projects in river corridor plans. The Agency has since decided to use the term “river corridor” instead of FEH area, because reference to an area of fluvial erosion hazard was gaining the popular, but inaccurate notion that the ANR was mapping where erosion would take place and where it would not. Using a term such as river corridor, that is not self-defining, allows ANR to explain the purpose of the corridor for minimizing erosion hazards. In 2012, the terminology became more complex when the Legislature added the term: “river corridor protection area.” 

The following key should help to clarify these terms:  

  • River Meander Belt equals:
    • FEH- fluvial erosion hazard area
    • River Corridor Protection Area (RCPA) 
  • River Meander Belt + Riparian Buffer equals:
    • River Corridor
    • FEH + Riparian buffer component
    • RCPA + Riparian buffer component
Blue shaded = meander belt component; Green shaded border = riparian buffer component

4. Why do we need to define river corridors when we have the FEMA flood maps?

FEMA Special Flood Hazard Areas show where inundation would occur during a flood that has a 1% chance of occurring in any given year (commonly referred to as the 100-yr or base flood). While this hazard information is very important, the FEMA inundation areas have only been mapped for approximately 20% of Vermont stream miles and post-flood damage surveys have shown that fluvial erosion, not inundation, is the most common natural hazard type in Vermont. Vermont decided to develop river corridor maps because they represent a zone for the management of erosion hazards.

River corridors account for the fact that rivers change vertically and horizontally over time, and, therefore, are not as likely to become outdated as FEMA maps, which are based on the 
elevation and location of the river at the time when the maps are produced. Within river corridors, floodplains may be formed and maintained over time. This means that corridors may consistently help mitigate both erosion and inundation hazards in comparison to the FEMA map counterpart. 

Stream channel meander pattern adjustment over time

5.    Why publish a statewide map? 

Previously, if a developer, landowner, or municipal official wanted to begin planning a new development or land improvement project that would require a state flood hazard or Act 250 permit, they would have had no consistent way of knowing where the ANR river corridor would be located (prior to the statewide map) without making a special request or applying for their land use permits.  The process of ad hoc river corridor delineations had become increasingly inefficient. Now ANR river corridor data is available on the ANR Natural Resource Atlas and can be viewed at a much earlier point in the project planning process. The base map also gives municipalities a better tool for town planning, designating centers of growth, and implementing zoning bylaws that may include river corridor protections in a consistent town-wide manner. 

6.    How are river corridors determined? 

Depiction of Meander Belt Construction

The ANR has published documents that detail the process for delineating river corridors, including the Flood Hazard Area and River Corridor Protection Procedure (2014) and the River Corridor Protection Guide (2008). River corridors are comprised of meander belt and riparian buffer components for the purpose of achieving and maintaining stream equilibrium conditions. The meander belt is an area calculated to accommodate the amplitude of stream meanders that have or will form in response to the laws of physics which dictate that channel depth and slope evolve toward a state of minimal work (i.e., equilibrium or least erosive form). The width of the meander belt will vary depending on the amount of land draining to a given point on a stream, so the River Corridor width varies in part based on stream size. The riparian buffer component is designed as an extension of the meander belt to provide additional development setback space so that when meanders move to the edge of the meander belt there is still room to establish or maintain a naturally vegetated buffer that would function as resistance to further lateral streambank erosion. If this extension were not included and structures were planned at the very edge of the meander belt, a prospective home or business owner would need to plan to armor the river bank to protect the structure BEFORE the meander evolved to its stable amplitude.  With the additional setback provided by the Riparian Buffer Component, structures may be placed just outside the River Corridor and, as the river meander evolves in the direction of the structure, a space will be available to establish a woody buffer that will provide resistance to the lateral erosion on the channel, potentially avoiding the expense of hard-armoring.   

Showing the (green cross-hatched) riparian buffer component of the river corridor, as an extension off the meander belt, to accommodate the actual buffers (green bands) when the stream meanders are at their equilibrium amplitude. Buffer components are drawn beyond natural confining fea- tures such as the valley wall but not beyond engineered levees, railroads, or federal aid highways.

7.    Why are state highways excluded from the corridor? Does that mean they are not subject to fluvial erosion hazards? 

River corridor

On the contrary, where a corridor has been moved and the state highway has been set as the boundary for the corridor, the infrastructure is very much at risk from erosion during a flood.  The corridor, as a management zone, was shifted to achieve stream equilibrium and floodplain function on lands opposite a major highway in recognition of the investments made to maintain the road alignment. With a full expression of meanders becoming possible away from the road, the erosion hazard will become less to both the road and downstream properties. Alternatively, if the corridor was not shifted and new development was placed opposite the highway, the river would become pinched between the highway and the new structures and become even more hazardous. The fact that ANR has placed river corridors at the edge of the state highways does not change the state’s commitment to transportation corridor planning that will examine erosion hazards where roads and rivers meet.  Alternatives including the possible movement of a state highway will be examined based on the benefits and costs and the opportunity to mitigate hazards system-wide within a watershed.  Importantly, this same planning process is available to municipalities who may wish to shift corridors off certain town highways or other public infrastructure important to the community as part of the corridor map revision process, as outlined in the Flood Hazard Area and River Corridor Protection Procedure. 

 

8.    Why are these river corridor maps different than the ones previously developed for our town? 

The ANR has been working with its partners to conduct Phase 2 stream geomorphic assessments and produce river corridor plans. These detailed field studies have produced high quality meander belt mapping. The statewide base map is made by using the science developed through these Phase 2 assessments to develop corridors for all streams with a watershed greater than 2 square miles. Some of the detail found during field studies have not yet been incorporated in order to achieve universal map coverage as soon as possible, and will be added back in through the map update process. In some watersheds this process has already begun, and where detailed field data exists it will be consulted as part of any ANR regulatory decision. Another reason the maps will look different is because a riparian buffer component is now included. Through Acts 138 and 107, the Vermont General Assembly specified that river corridors, delineated and promoted by the ANR, should include riparian buffers. Therefore, the meander belts have been extended on either side to accommodate a 50 foot riparian buffer. This buffer distance is based on a conservative evaluation (from the scientific literature) of the amount of natural vegetation necessary to minimize erosion of stream banks and reduce flood water velocities in the near-bank region (see FAQ #6). With public notification, the base map may be updated to reflect better data, either from that collected during previous Phase 2 assessments or from new data that may become available.

9.    Why is the small stream setback fifty feet? 

River corridors have not been mapped along streams with a watershed of 2 square miles or less. Rather, these streams are managed and protected from an erosion minimization standpoint (i.e., considering meander belt and buffer functions) with a simple 50 foot setback measured from the top of the stream bank. This distance provides a setback for the bank stability function of natural riparian vegetation while also providing space for a meander belt which, for small streams, will typically range between one and four bankfull channel widths. Small streams may be found in any type of valley setting in Vermont, but the majority flow in steep narrow valleys and have meander amplitudes far less than those in wider alluvial settings with more gentle gradients. The standard 50 foot setback will meet the river corridor objectives in most cases and is intended to simplify the mapping and administration of corridor protections. In site-specific applications, the Agency may delineate, or project proponents may provide the field data to define, a corridor for a small stream that may expand the setback from the 50 foot mark.  

10.    Will these maps affect what I can do with my land? 

Regulations that reference river corridors include the following: 

  • Act 250 regulates land use in floodways, and the ANR makes floodway determinations that include river corridors; 
  • State regulation of developments that are exempt of municipal regulation; and 
  • Town Regulation of land use where the municipality has protected river corridors as part of its zoning bylaws. 

Such regulations are not retroactive, that is they do not affect land uses and development permitted when the regulations took effect. Any development or land improvement that is exempt from municipal land use regulation (in an NFIP-enrolled town) is subject to the State Flood Hazard Area and River Corridor Rule. Generally, these exemptions would include state-owned facilities, utilities regulated under Section 248, agricultural structures, and silvicultural structures (see the Rule for definitions of these terms). Any development requiring an Act 250 permit must meet criterion 1(D) Floodways. The ANR will include the river corridor as a component in its Act 250 floodway determination and make recommendations that the development meet a no-adverse-impact standard (as established in the State Rule). This standard aims to direct new development out of river corridors, but make exceptions for stream crossings, redevelopment and certain types of infill. These exceptions are described in detail in the Flood hazard Area and River Corridor Protection Procedure. The Procedure also outlines a set of best management practices to help landowners and towns costeffectively manage stream channels, riparian buffers, and floodplains toward stable equilibrium conditions. Town land use regulations may also apply where the municipality has protected river corridors as a part of its zoning bylaws. If your community has adopted a river corridor or river corridor protection area zoning bylaw, the ANR will provide technical reviews and recommendations for municipally regulated projects, when requested, based on the municipal bylaws and the municipally adopted maps. 

11.    Are towns required to adopt corridor maps? 

No. State legislation has been passed in recent years requiring ANR to develop advisory river corridor maps for all municipalities, adopt State River Corridor Protection Procedures to include best management practices, and make model bylaws and other incentives to assist municipalities, but have not required action on the part of municipalities to adopt corridor maps at this time.  

12.    Can a map be updated or revised? 

Yes. The Flood Hazard Area and River Corridor Protection Procedures include a section on how the Agency or other parties may pursue major and minor map updates. “Major updates” involve the collection of data and analysis to reevaluate stream sensitivity or derive specific meander belt or buffer widths. “Minor updates” include correcting remnants or quirks of the mapping process and single adjustments to factor in features documented with data (e.g., unmapped bedrock outcrop) unavailable when the base map was developed. The Agency shall publish the updated maps on the ANR Natural Resource Atlas and notify the affected municipalities, the Regional Planning Commission(s), and the Act 250 District Commissions. It should be noted that amending the flood hazard area maps and updating river corridor maps are different and separate processes. For instance, going through the process of certifying the elevation of your property and getting a Letter of Map Amendment approved by FEMA with respect to an inundation zone does not change the State river corridor delineation. 

13.    Will maps be updated on a regular basis? 

Yes. The Agency may conduct updates on all or portions of the Statewide River Corridor Layer as needed (e.g., following major floods), as requested by a municipality, and on a published schedule of watershed-scale updates to incorporate administrative revisions requested by municipalities, Phase 2 stream geomorphic data, and new meander centerline, valley wall, and local field data that are collected and provided to the Agency. Such updates shall be noticed on the DEC and ANR web pages for public review and comment for a 30-day period. The Agency shall provide maps to and solicit comments from municipalities, the Regional Planning Commissions, the Act 250 District Commissions, and other interested parties and notify these jurisdictions when the State adopts an updated Statewide River Corridor Layer. 

14.    Rivers change during floods (like Irene), do the corridor maps take this into account? 

A fundamental concept in establishing the river corridor as a management zone is that the river corridor should accommodate the dynamic processes of a stream, including the changes that may be observed after a flood. Streams can change vertically and horizontally during a flood and the location of the management zone should remain valid. If changes are incremental and the bank lines approach the outside of the meander belt, the lateral movement of the channel may be arrested with bank revetments (green or otherwise) at a given location to keep the stream within the corridor. In this situation, property outside the designated corridor can be protected from fluvial erosion with less concern for transferring risks to properties downstream. However, map updates may become important as a result of flooding, including those instances where 1) long-term changes in watershed hydrology significantly impact channel geometry and the width of the meander belt, or 2) during a flood event, lateral erosion of the channel happens so suddenly and severely, that the channel is completely outside a previously drawn corridor. 

15.    The stream in my neighborhood has never moved and the stream banks are lined with rip rap stone. Why is the River Corridor so wide? 

River corridors are based on the amplitude of meanders that will evolve in different valley types as a river adjusts to toward an equilibrium (i.e., vertically stable—least erosive) condition. When streams attain their naturally stable condition it is easy to see, taking a bird’s eye view, that the meander belt lines are drawn along the outside bends of successive meanders. Setting aside those lands in between fully expressed meanders is easier to make sense of. In contrast, it is harder to imagine a stream that has been straightened and armored as needing the amount of corridor space that has been set aside. While a stream may not move for decades, there comes a time when a large enough flood occurs or a chink in the bank armor sets in motion a process of rapid stream bed and bank erosion and a full occupation of the river corridor. These events have been documented time and time again in Vermont stream geomorphic assessments, as streams work to re-establish their most natural meander patterns. River corridors are designed to provide space for this process to happen. It should be noted that the Flood Hazard Area and River Corridor Protection Procedures create opportunities for changing river corridor delineations, including situations where the degree of existing encroachment and the active channel management used to protect those investments preclude the attainment of natural equilibrium conditions (e.g., in a village setting).

Development built next to river on lands not in the NFIP designated flood hazard area, where rip-rap used to protect the investment began failing after seven years.

16.    The River Corridor goes right through most of our village area. How does this affect our community’s growth? 

Depending on local land use restrictions, the river corridor delineation through a village area is likely to have far less effect on community growth compared with areas outside the village. Both the State Rule and the ANR Procedures allow for infill and redevelopment within state or locally designated centers or in proximity to other existing improvements, as long as the new development is no closer to the river than existing development and does not require new channel management that would not otherwise occur. The most effective way to revise corridors through village areas is through municipal planning, the state designation process, and the local zoning bylaw adoption process. 

17.    Will flood insurance be required now if my house is in the River Corridor? 

No. State and federal laws do not require you to purchase flood insurance because your house is located in a river corridor. The federal requirement for flood insurance applies when your property is located in a FEMA Special Flood Hazard Area and you have a federally backed loan or mortgage on the property. However, if you do find yourself in a mapped flood hazard area or river corridor, and you do not have flood insurance, you should strongly consider purchasing a NFIP flood insurance policy. If your house is not in a FEMA Special Flood Hazard Area but is within the state-delineated river corridor, you can buy a policy for a much lower cost (i.e., rated as though your house were in any location outside the flood hazard area). 

18.    Why should communities protect river corridors? 

The state Flood Ready webpage is packed with information to help a community access maps and other tools to begin the important work of protecting river corridors. In summary, the naturally stable, least erosive form of a stream or river is a tremendous community asset. If river corridors are not protected at the community level, we as a State will bear an ever-increasing burden (i.e., in terms of flood disasters and the human misery they cause) when there are less and less places on the landscape where streams can expend the flows and erosive energy of a flood. When we encroach on a river in one location and then armor the river to protect our investment, we very often ensure that the next flood of equal flow will cause even more destructive erosion downstream. Breaking the vicious cycle between increasing costs and increasing risk, can be achieved and is sustainable where we allow floodplains to flood and rivers to meander in those corridors that still remain open. These riparian features are a part of our green infrastructure, that when squandered results in millions spent during disaster recovery to fortify channelization practices and rebuild—with little or no reduction in the vulnerability of our communities.