Morrill Courtyard Utilities (2016)
Morrill Courtyard Utilities (2016)
This extensive project addressed structurally deficient manholes, deteriorated asbestos-insulated steam lines, non-code compliant rails, and accessibility deficiencies around the Morrill Buildings.
Completed: Fall 2016
Structural & Landscaping: Fuss & O'Neil, Inc.
Mechanical: LN Consulting
Construction Manager: J&J Contractors, Inc.
UMass Project Manager: C. Kim Jaworski-Bruschi
Project Scope
Utilities Improvements:
- Steam system replacement including a walkable tunnel
- Installation of walkable tunnel improves future maintenance and protects the investment of surface upgrades
- Provided a new tunnel exhaust fan system
- Provided electrical and telecom improvements from Stockbridge Circle through the courtyard including a spare conduit for future system expansions
- New stormwater management system was installed including new yard drains, catch basins and surface collection inlets.
- New loop connection through Morrill II basement to main water mains from Stockbridge Road and North Pleasant Street Water line addition
- Asbestos-containing materials abatement from steam lines, exterior of the steam manholes, building foundations and electrical duct banks.
The project also included the following surface and landscape improvements:
- Barrier-free accessible pathways to building entrances and courtyard space from North Pleasant Street
- Improved pedestrian flow – to serve as eastern gateway from North Pleasant Street to Stockbridge Corridor
- Larger and more functional gathering spaces and seating
- Safety improvements – lighting and code-compliant walkways and stairways
- Increased visibility from North Pleasant Street
- Aesthetic enhancements – new plantings, green screens, and incorporation of boulder specimens from UMass Geosciences
|
|