Search Google Appliance

Information Technology

Planned Maintenance: Wired Connectivity in Some Areas of Campus – Wed, 11/09

November 2, 2022

On Wednesday, November 9th, 2022, from 6-8 AM, wired connectivity in some parts of campus may be temporarily interrupted while UMass Amherst Information Technology (IT) performs network maintenance. Wireless connectivity will not be affected.

While minimal impact is expected, we recommend that members of the campus community who work in the buildings listed below:

  • Postpone operations during the maintenance window and back up critical data.
  • Check the IT website for updates on network status.
  • Connect with the IT professional and/or building coordinator in their area for specific guidance.

Thank you for your patience as we implement new security controls intended to increase the resilience of our IT infrastructure and strengthen protections for the campus technology environment. As part of the migration process, architecture changes are being applied to the firewall, which could possibly impact users. This maintenance window is part of an ongoing initiative that will expand to other areas of campus in the future.

To report connectivity issues outside the maintenance window, please contact the IT Service Desk at it@umass.edu.

Buildings Impacted

  • 758 North Pleasant (Holocaust, Genocide & Memory Studies)
  • Agricultural Engineering Annex A
  • Agricultural Engineering Annex B
  • Agricultural Engineering Annex North
  • Agricultural Engineering Annex South
  • Astronomy Building
  • Auxiliary Services Food Storage Building
  • Bowditch Hall Greenhouse
  • Cashin House, Sylvan Residential
  • Chenoweth Laboratory
  • Conte Polymer Research Center
  • Draper Hall
  • Duda Hall
  • Engineering Laboratory I
  • Engineering Laboratory II
  • Physical Plant Flammable and Hazardous Waste Storage
  • Flint Laboratory
  • Goessmann Laboratory
  • Goessmann Laboratory Addition
  • Gunness
  • Hasbrouck Laboratory
  • Hasbrouck Laboratory Annex
  • Hatch
  • Holdsworth Hall
  • Knowles Engineering Building
  • Lederle Graduate Research Center
  • Lederle Graduate Research Towers
  • Marcus Hall
  • Marston
  • Mather
  • North Chiller Plant (Polymer Chiller)
  • Paige Laboratory
  • Parking Services Trailer I
  • Parking Services Trailer II
  • Parking Services Trailer III
  • Physical Plant Building
  • Physical Plant Building Addition
  • Physical Science Building and West Experiment Station Addition
  • Police Station (UMPD)
  • PVTA Transit Facility - RTIC
  • Stockbridge Hall
  • Totman Physical Education Building