AG Engineering NorthAG Engineering North
ID#: 8,874
Building(s) / Areas Affected: AG Engineering North
Shutdown Duration: 7/28/22 07:00 am to 12/30/22 03:30 pm
Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation.
Occupants will be redirected to use bathrooms in AG Engineering South.
WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: [field_shop_actions]
Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
AG Engineering NorthAG Engineering North
ID#: 8,876
Building(s) / Areas Affected: AG Engineering North
Shutdown Duration: 7/28/22 07:00 am to 12/30/22 03:30 pm
Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.
WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: [field_shop_actions]
Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
Lederle Low RiseLederle Low Rise
ID#: 9,172
Building(s) / Areas Affected: Lederle Low Rise
Shutdown Duration: 9/20/22 07:00 am to 9/30/22 03:30 pm
Shutdown Reason: This request is for the shut down of AHU-5 in the basement to change the dual deck duct work in room A112. This will involve asbestos abatement of the duct work mastic. This deck supplies many VAV's for the first floor. This portion of the work is expected to take just under two weeks to complete. The shut down will also involve VAV's in room A112 which supply air to some offices above namely A247, A249, A251, A253 and A255. These second floor offices will be off line for 4 to 6 weeks.
WO#: 1024301
Shop Assisting: HVAC
Shop Action: [field_shop_actions]
Project Manager: Mike Gobeille
Phone: 413-992-8558
Dept: DCM
HVAC
[field_systems_affected]
Lederle Low RiseLederle Low Rise
ID#: 8,800
Building(s) / Areas Affected: Lederle Low Rise
Shutdown Duration: 7/18/22 07:00 am to 1/27/23 03:30 pm
Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.
WO#: 1024301
Shop Assisting: None
Shop Action: [field_shop_actions]
Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM
Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
[field_systems_affected]
Lederle Low RiseLederle Low Rise
ID#: 8,872
Building(s) / Areas Affected: Lederle Low Rise
Shutdown Duration: 7/28/22 07:00 am to 1/27/23 03:30 pm
Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.
WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: [field_shop_actions]
Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
Lederle Low Rise - A314, A316, A318 Lederle Low Rise - A314, A316, A318
ID#: 8,788
Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318
Shutdown Duration: 7/14/22 07:00 am to 1/27/23 03:30 pm
Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.
WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: [field_shop_actions]
Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
Lederle Low Rise rooms A124, A128, A126 and A130Lederle Low Rise rooms A124, A128, A126 and A130
ID#: 8,846
Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130
Shutdown Duration: 7/21/22 07:00 am to 1/27/23 03:30 pm
Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.
WO#: 1024301
Shop Assisting: N/A
Shop Action: [field_shop_actions]
Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
Lederle low Rise rooms A218, A222, A220, A226 and A228Lederle low Rise rooms A218, A222, A220, A226 and A228
ID#: 8,844
Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228
Shutdown Duration: 7/21/22 07:00 am to 1/27/23 03:30 pm
Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.
WO#: 1024301
Shop Assisting: N/A
Shop Action: [field_shop_actions]
Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM
Electric, Fire Alarm System, HVAC, Water
[field_systems_affected]
Mullins CenterMullins Center
ID#: 9,152
Building(s) / Areas Affected: Mullins Center
Shutdown Duration: 9/14/22 09:00 am to 10/14/22 10:00 am
Shutdown Reason: State elevator inspection to retest phone service
WO#: 22-200536220
Shop Assisting: None
Shop Action: [field_shop_actions]
Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP
[field_systems_affected]
|