September 2022

Sun Mon Tue Wed Thu Fri Sat
28
29
30
31
1
2
3
 
 
 
 
«
AG Engineering North

AG Engineering North

ID#: 8,874

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation. Occupants will be redirected to use bathrooms in AG Engineering South.

WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
AG Engineering North

AG Engineering North

ID#: 8,876

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.

WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
Agricultural Engineering

Agricultural Engineering

ID#: 9,094

Building(s) / Areas Affected: Agricultural Engineering

Shutdown Duration:

8/31/22 07:00 am to 9/1/22 03:00 pm

Shutdown Reason: This water service shut down request is to tie in a 4" sprinkler line to the existing 6" main coming into the building. The existing main might feed other buildings.

WO#: 3000575
Shop Assisting: Plumbing
Shop Action: May need assistance from the plumbing shop to verify valve locations.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Water
Water - cold, Water - drench shower / eyewash, Water - hot

 
 
 
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,872

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/28/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.

WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,800

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/18/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.

WO#: 1024301
Shop Assisting: None
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise - A314, A316, A318

Lederle Low Rise - A314, A316, A318

ID#: 8,788

Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318

Shutdown Duration:

7/14/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.

WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: None anticipated at this time. Contractor will turn off utilities locally.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise rooms A124, A128, A126 and A130

Lederle Low Rise rooms A124, A128, A126 and A130

ID#: 8,846

Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos

»
«
Lederle low Rise rooms A218, A222, A220, A226 and A228

Lederle low Rise rooms A218, A222, A220, A226 and A228

ID#: 8,844

Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Ventilation, Water - cold, Water - hot
Asbestos

»
«
South Deerfield Tractor Repair and Turf Facility

South Deerfield Tractor Repair and Turf Facility

ID#: 9,086

Building(s) / Areas Affected: South Deerfield Tractor Repair and Turf Facility

Shutdown Duration:

8/30/22 05:00 pm to 9/1/22 11:00 pm

Shutdown Reason: FASS personnel will be inspecting all fire alarm system devices between 5pm and 11pm. The majority of the testing will be silent. Fire alarm sounding and flashing of strobe lights may occur for brief periods. The testing activities should not cause any interruption in building activities.

WO#: 19-200332353 and 19-200332253
Shop Assisting: FASS
Shop Action: Annual NFPA fire alarm inspection

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP

Fire Alarm System
Fire Alarms/Suppression

 
 
 
LGRC Tower

LGRC Tower

ID#: 9,162

Building(s) / Areas Affected: LGRC Tower

Shutdown Duration: 9/1/22

07:00 am to 02:00 pm

Shutdown Reason: To remedy code violations in the elevator pits. 2 will be shutdown at a time. There will be running elevators while the work is being done.

WO#: 22-200536220
Shop Assisting: NA
Shop Action: NA

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

 
Marcus

Marcus

ID#: 9,096

Building(s) / Areas Affected: Marcus

Shutdown Duration: 9/1/22

07:00 am to 12:00 pm

Shutdown Reason: Sanitize the Marcus Clean Room water purification system (RO water)

WO#: 14-100063367
Shop Assisting: None
Shop Action: None

Project Manager: Andrew Thibault
Phone: 545-0201
Dept: PP


Reverse Osmosis Water System

 
PSB

PSB

ID#: 9,098

Building(s) / Areas Affected: PSB

Shutdown Duration: 9/1/22

08:00 am to 12:00 pm

Shutdown Reason: Shut down of elevator car1 to move to a different emergency panel so Hvac is not disrupted during annual State elevator test

WO#: 22-200525703
Shop Assisting: Otis elevator
Shop Action: check elevator function after change over

Project Manager: Alfred Ohlson
Phone: 545 0849
Dept: PP


Elevators

 
4
5
6
7
8
9
10
«
AG Engineering North

AG Engineering North

ID#: 8,874

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation. Occupants will be redirected to use bathrooms in AG Engineering South.

WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
AG Engineering North

AG Engineering North

ID#: 8,876

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.

WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,872

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/28/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.

WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,800

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/18/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.

WO#: 1024301
Shop Assisting: None
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise - A314, A316, A318

Lederle Low Rise - A314, A316, A318

ID#: 8,788

Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318

Shutdown Duration:

7/14/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.

WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: None anticipated at this time. Contractor will turn off utilities locally.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise rooms A124, A128, A126 and A130

Lederle Low Rise rooms A124, A128, A126 and A130

ID#: 8,846

Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos

»
«
Lederle low Rise rooms A218, A222, A220, A226 and A228

Lederle low Rise rooms A218, A222, A220, A226 and A228

ID#: 8,844

Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Ventilation, Water - cold, Water - hot
Asbestos

»
 
 
Boyden Rm 138

Boyden Rm 138

ID#: 9,166

Building(s) / Areas Affected: Boyden Rm 138

Shutdown Duration:

9/6/22 06:00 am to 9/7/22 06:00 pm

Shutdown Reason: This is a request to shut down the steam pipes to the two air handler units in Boyden varsity weight room #138. As part of the Boyden Rm 138 renovation, we need to demo 2 air handler units. We must disconnect them from the steam system to remove them. We will cap the pipes after we disconnect the units. This work has been waiting for abatement to be complete, which is why this is less than 10 day notice. Sorry for short notice.

WO#: 3000060
Shop Assisting: Utilities
Shop Action: Please shut down the steam pipes feeding the two air handlers in Boyden rm 138 so that the units can be disconnected. We will cap the pipes after we disconnect the units.

Project Manager: Paul Bordua
Phone: 8673800022
Dept: Alterations

HVAC, Steam - high, Steam - low
Heat, Ventilation

 
 
 
 
Auxiliary Services Food Storage Building

Auxiliary Services Food Storage Building

ID#: 9,128

Building(s) / Areas Affected: Auxiliary Services Food Storage Building

Shutdown Duration:

9/6/22 05:00 pm to 9/7/22 11:00 pm

Shutdown Reason: FASS personnel will be inspecting all fire alarm system devices on September 6 and 7 between 5pm and 11pm. The majority of the testing will be silent. Fire alarm sounding and flashing of strobe lights may occur for brief periods. The testing activities should not cause any interruption in building activities.

WO#: 19-200332109
Shop Assisting: FASS
Shop Action: Annual NFPA inspection

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP

Fire Alarm System
Fire Alarms/Suppression

 
 
 
Boyden Rm 138

Boyden Rm 138

ID#: 9,168

Building(s) / Areas Affected: Boyden Rm 138

Shutdown Duration:

9/7/22 06:00 am to 9/8/22 04:00 pm

Shutdown Reason: Please disable the fire alarm devices in Boyden Rm 138 during demolition work. Thanks,

WO#: 3000060
Shop Assisting: FASS
Shop Action: Please disable the fire alarm devices in Boyden Rm 138 during demo work. The two devices I see are laser beam type devices that are high up on the wall. Thanks,

Project Manager: Paul Bordua
Phone: 9783800022
Dept: PP

Fire Alarm System
Fire Alarms/Suppression

 
 
Lederle GRC Low rise and tower

Lederle GRC Low rise and tower

ID#: 9,154

Building(s) / Areas Affected: Lederle GRC Low rise and tower

Shutdown Duration: 9/8/22

08:00 am to 10:30 am

Shutdown Reason: Re-inspection of elevators 9-P-124, 112, 113, 114 and 115

WO#: 22-200536220
Shop Assisting: FASS
Shop Action: To test FA elevator recall. Please use WT# 22-200536188

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

 
LGRC Tower

LGRC Tower

ID#: 9,150

Building(s) / Areas Affected: LGRC Tower

Shutdown Duration: 9/8/22

09:00 am to 10:00 am

Shutdown Reason: State re-inspection to verify switches in the pit have been related

WO#: 22-200536220
Shop Assisting: None
Shop Action: NA

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

 
11
12
13
14
15
16
17
«
AG Engineering North

AG Engineering North

ID#: 8,874

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation. Occupants will be redirected to use bathrooms in AG Engineering South.

WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
AG Engineering North

AG Engineering North

ID#: 8,876

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.

WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,872

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/28/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.

WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,800

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/18/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.

WO#: 1024301
Shop Assisting: None
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise - A314, A316, A318

Lederle Low Rise - A314, A316, A318

ID#: 8,788

Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318

Shutdown Duration:

7/14/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.

WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: None anticipated at this time. Contractor will turn off utilities locally.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise rooms A124, A128, A126 and A130

Lederle Low Rise rooms A124, A128, A126 and A130

ID#: 8,846

Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos

»
«
Lederle low Rise rooms A218, A222, A220, A226 and A228

Lederle low Rise rooms A218, A222, A220, A226 and A228

ID#: 8,844

Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Ventilation, Water - cold, Water - hot
Asbestos

»
 
Lederle Graduate Research Tower - Tower A - 15th and 16th floors

Lederle Graduate Research Tower - Tower A - 15th and 16th floors

ID#: 9,102

Building(s) / Areas Affected: Lederle Graduate Research Tower - Tower A - 15th and 16th floors

Shutdown Duration: 9/12/22

07:00 am to 03:00 pm

Shutdown Reason: Please see attached redlined drawings for scope of work specific to this impairment notification. In tower C level 16, (2) wall mounted speaker/strobes will be removed for future use. Loop will be maintained. In tower A level 15, (8) wall mounted speaker/strobes and (1) pull station will be removed for future use. Loop will be maintained. (1) speaker/strobe will be relocated out of GWB. In tower A level 16, (9) wall mounted speaker/strobes and (1) pull station will be removed for future use. Loop will be maintained. (3) Penthouse Duct Smokes will be eliminated. Loop will be maintained. All penthouse speaker/strobes will be maintained. Please see attached temporary heat detector plan for construction. System will be shut down when working on it. Restored when not. Total of (1) day period where the system will be shut down. Date contingent on JCI's availability.

WO#: 1016409
Shop Assisting: Universal Electric - Aaron Brown
Shop Action: System will be shut down when working on it. Restored when not. Total of (1) day period where the system will be shut down. Date contigent on JCI's availability.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Fire Alarm System
Fire Alarms/Suppression

 
Switch Gear Building

Switch Gear Building

ID#: 9,160

Building(s) / Areas Affected: Switch Gear Building

Shutdown Duration:

9/13/22 05:00 pm to 9/15/22 11:00 pm

Shutdown Reason: FASS personnel will be inspecting all fire alarm system devices on September 13, 14 and/or 15 between 5pm and 11pm. The majority of the testing will be silent. Fire alarm sounding and flashing of strobe lights may occur for brief periods. The testing activities should not cause any interruption in building activities.

WO#: 22-200529142
Shop Assisting: FASS
Shop Action: Annual NFPA inspection

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP

Fire Alarm System
Fire Alarms/Suppression

 
 
 
LGRT 15th and 16th floors

LGRT 15th and 16th floors

ID#: 9,182

Building(s) / Areas Affected: LGRT 15th and 16th floors

Shutdown Duration: 9/13/22

07:00 am to 03:00 pm

Shutdown Reason: Demolish sprinklers from 16 and 15th floor "A wing" as part of the Math Construction renovation project. To make way for install of new sprinkler system. Universal will shut off the FA system. SRI will demo and cap existing sprinkler system as necessary. Universal will turn FA system back on.

WO#: 1016409
Shop Assisting: FA Shop
Shop Action: Be aware that Universal Electric will be silencing / over riding the FA system while the sprinkler demolition is taking place and will put the FA system back in service before end of day.

Project Manager: Michael Gobeille
Phone: 413.992.8558
Dept: DCM

Fire Alarm System
Fire Alarms/Suppression

 
Mullins Center

Mullins Center

ID#: 9,152

Building(s) / Areas Affected: Mullins Center

Shutdown Duration:

9/14/22 09:00 am to 10/14/22 10:00 am

Shutdown Reason: State elevator inspection to retest phone service

WO#: 22-200536220
Shop Assisting: None
Shop Action: NA

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

»
 
 
 
 
18
19
20
21
22
23
24
«
AG Engineering North

AG Engineering North

ID#: 8,874

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation. Occupants will be redirected to use bathrooms in AG Engineering South.

WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
AG Engineering North

AG Engineering North

ID#: 8,876

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.

WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,872

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/28/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.

WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,800

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/18/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.

WO#: 1024301
Shop Assisting: None
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise - A314, A316, A318

Lederle Low Rise - A314, A316, A318

ID#: 8,788

Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318

Shutdown Duration:

7/14/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.

WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: None anticipated at this time. Contractor will turn off utilities locally.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise rooms A124, A128, A126 and A130

Lederle Low Rise rooms A124, A128, A126 and A130

ID#: 8,846

Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos

»
«
Lederle low Rise rooms A218, A222, A220, A226 and A228

Lederle low Rise rooms A218, A222, A220, A226 and A228

ID#: 8,844

Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Mullins Center

Mullins Center

ID#: 9,152

Building(s) / Areas Affected: Mullins Center

Shutdown Duration:

9/14/22 09:00 am to 10/14/22 10:00 am

Shutdown Reason: State elevator inspection to retest phone service

WO#: 22-200536220
Shop Assisting: None
Shop Action: NA

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

»
 
Paradis Boiler Plant

Paradis Boiler Plant

ID#: 9,148

Building(s) / Areas Affected: Paradis Boiler Plant

Shutdown Duration: 9/19/22

06:00 am to 10:00 am

Shutdown Reason: Fire Equipment, Inc. will be conducting annual NFPA fire alarm system testing and inspecting all fire alarm system devices on September 19. The majority of the testing will be silent. Alarm sounding and flashing lights are expected to occur at approximately 6am. The testing activities should not cause any interruption in building activities. Please forward this communication to appropriate staff within the building. Contact your Customer Service Representative with any questions.

WO#: 22-200530025
Shop Assisting: FASS
Shop Action: Assist contractor if necessary

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP

Fire Alarm System
Fire Alarms/Suppression

 
University Village Buildings C, D, E, F, G & H

University Village Buildings C, D, E, F, G & H

ID#: 9,214

Building(s) / Areas Affected: University Village Buildings C, D, E, F, G & H

Shutdown Duration: 9/19/22

09:00 am to 10:00 am

Shutdown Reason: Emergency Electrical Shutdown to University Village to energize buildings A & B.

WO#: 1021176
Shop Assisting: UMA Electrical Utilities Physical Plant
Shop Action: To assist Griffin Electric with fuses to power up buildings A & B

Project Manager: Marcin Celmer
Phone: 413-219-6067
Dept: DCM

Electric
Air Conditioning, Computers, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Kitchen Equipment, Water - hot

 
UMass Police

UMass Police

ID#: 9,158

Building(s) / Areas Affected: UMass Police

Shutdown Duration: 9/19/22

11:00 am to 01:00 pm

Shutdown Reason: Fire Equipment, Inc. suppression system inspection at 2nd floor IT room (Novec system).

WO#: 22-200534765
Shop Assisting: FASS
Shop Action: Assist contractor if necessary

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP


Fire Alarms/Suppression

 
Lederle Low Rise

Lederle Low Rise

ID#: 9,172

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

9/20/22 07:00 am to 9/30/22 03:30 pm

Shutdown Reason: This request is for the shut down of AHU-5 in the basement to change the dual deck duct work in room A112. This will involve asbestos abatement of the duct work mastic. This deck supplies many VAV's for the first floor. This portion of the work is expected to take just under two weeks to complete. The shut down will also involve VAV's in room A112 which supply air to some offices above namely A247, A249, A251, A253 and A255. These second floor offices will be off line for 4 to 6 weeks.

WO#: 1024301
Shop Assisting: HVAC
Shop Action: Tim Plant is aware of this shut down and agreed to assist shutting down the unit and starting it back up.

Project Manager: Mike Gobeille
Phone: 413-992-8558
Dept: DCM

HVAC
Air Conditioning, Heat
Asbestos

»
 
Goessmann (OLD)

Goessmann (OLD)

ID#: 9,164

Building(s) / Areas Affected: Goessmann (OLD)

Shutdown Duration: 9/21/22

06:00 am to 11:00 am

Shutdown Reason: HVAC duct work. The fume hoods in old Goessmann will not be useable during this time.

WO#: 21-200520164
Shop Assisting: n/a
Shop Action: n/a

Project Manager: Stephen Lobik
Phone: 413-326-1651
Dept: DCM

HVAC
Fume Hood

 
 
 
 
25
26
27
28
29
30
1
«
AG Engineering North

AG Engineering North

ID#: 8,874

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Request to shut down bathrooms 119C and 119E for complete renovation. Occupants will be redirected to use bathrooms in AG Engineering South.

WO#: 3000575
Shop Assisting: Nor required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
 
«
AG Engineering North

AG Engineering North

ID#: 8,876

Building(s) / Areas Affected: AG Engineering North

Shutdown Duration:

7/28/22 07:00 am to 12/30/22 03:30 pm

Shutdown Reason: Requesting shut down of Custodial room 118 for renovation.

WO#: 3000575
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Cleve Carrens
Phone: 413-326-1660
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Heat, Sewer, Water - cold, Water - hot
Asbestos, Lead

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,872

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/28/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: MEP's to be partially shut down in basement corridor 098J and room OA13 for renovation of Multipurpose room A112 on first floor. Computer room OA14 in basement will not be interrupted for this work if RFI for alternate duct plan is accepted. Lighting in corridor is to be replaced and temporary lighting will be installed as require to maintain proper egress lighting during construction.

WO#: 1024301
Shop Assisting: Not required at this time.
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 8,800

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

7/18/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Multipurpose room A112 and room A110 to include HVAC, Electrical, Plumbing and Fire Alarm work.

WO#: 1024301
Shop Assisting: None
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, Gas, HVAC, Steam - low, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise

Lederle Low Rise

ID#: 9,172

Building(s) / Areas Affected: Lederle Low Rise

Shutdown Duration:

9/20/22 07:00 am to 9/30/22 03:30 pm

Shutdown Reason: This request is for the shut down of AHU-5 in the basement to change the dual deck duct work in room A112. This will involve asbestos abatement of the duct work mastic. This deck supplies many VAV's for the first floor. This portion of the work is expected to take just under two weeks to complete. The shut down will also involve VAV's in room A112 which supply air to some offices above namely A247, A249, A251, A253 and A255. These second floor offices will be off line for 4 to 6 weeks.

WO#: 1024301
Shop Assisting: HVAC
Shop Action: Tim Plant is aware of this shut down and agreed to assist shutting down the unit and starting it back up.

Project Manager: Mike Gobeille
Phone: 413-992-8558
Dept: DCM

HVAC
Air Conditioning, Heat
Asbestos

 
«
Lederle Low Rise - A314, A316, A318

Lederle Low Rise - A314, A316, A318

ID#: 8,788

Building(s) / Areas Affected: Lederle Low Rise - A314, A316, A318

Shutdown Duration:

7/14/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of Bathrooms listed above to include wall demolition, plumbing and HVAC and construction of new walls and finishes.

WO#: 1024301
Shop Assisting: Not anticipated
Shop Action: None anticipated at this time. Contractor will turn off utilities locally.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Lederle Low Rise rooms A124, A128, A126 and A130

Lederle Low Rise rooms A124, A128, A126 and A130

ID#: 8,846

Building(s) / Areas Affected: Lederle Low Rise rooms A124, A128, A126 and A130

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A124 and A128 along with janitors closet A126 and storage room A130.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Water - cold, Water - hot
Asbestos

»
«
Lederle low Rise rooms A218, A222, A220, A226 and A228

Lederle low Rise rooms A218, A222, A220, A226 and A228

ID#: 8,844

Building(s) / Areas Affected: Lederle low Rise rooms A218, A222, A220, A226 and A228

Shutdown Duration:

7/21/22 07:00 am to 1/27/23 03:30 pm

Shutdown Reason: Renovation of bathrooms A218 and A222 along with janitors closet A220 and storage rooms A226 and A228.

WO#: 1024301
Shop Assisting: N/A
Shop Action: Not anticipated at this time.

Project Manager: Michael Gobeille
Phone: 413-992-8558
Dept: DCM

Electric, Fire Alarm System, HVAC, Water
Air Conditioning, Electric Lights, Electric Power, Fire Alarms/Suppression, Heat, Sewer, Ventilation, Water - cold, Water - hot
Asbestos

»
«
Mullins Center

Mullins Center

ID#: 9,152

Building(s) / Areas Affected: Mullins Center

Shutdown Duration:

9/14/22 09:00 am to 10/14/22 10:00 am

Shutdown Reason: State elevator inspection to retest phone service

WO#: 22-200536220
Shop Assisting: None
Shop Action: NA

Project Manager: Bob Perry
Phone: 413-835-5139
Dept: PP


Elevators

»
 
 
Photography Laboratory

Photography Laboratory

ID#: 9,186

Building(s) / Areas Affected: Photography Laboratory

Shutdown Duration:

9/27/22 05:00 pm to 9/29/22 11:00 pm

Shutdown Reason: FASS personnel will be inspecting all fire alarm system devices on September 27, 28 and/or 29 between 5pm and 11pm. The majority of the testing will be silent. Fire alarm sounding and flashing of strobe lights may occur for brief periods. The testing activities should not cause any interruption in building activities.

WO#: 19-200331601
Shop Assisting: FASS
Shop Action: Annual NFPA inspection

Project Manager: Phil Sorensen
Phone: 5-5658
Dept: PP

Fire Alarm System