This project will relocate and replace the track facility
that was displaced by the future Central Heating Plant currently in construction
west of the Mullins Center. The new track facility is being built to
the west
of the Rudd Soccer Field and the Softball field. The new facility will
be completed by the end of September, 2005, in time for the Track season.
It will include a 9-lane, 400 meter synthetic surface
track with steeplechase water jump, long and triple jumps, high-jump
area, pole vault, and track timing system. There will also be a separate
throwing events area south of Gladchuck Practice Fields and west of the
Stadium.
For some excellent pictures of the track construction progress, check out UMass Athletics' review of the project, "Construction On New Track & Field Complex Under Way."
|