  • DuBois, 3rd Floor Multimedia Relocation

    DuBois, 3rd Floor Multimedia Relocation

    Work Task ID: 
    17-100946177
    Dates: 
    Fri, 12/01/2017 to Sat, 05/23/2020
    Crew: 
    Design & Construction Management
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    DuBois, 3rd Floor Multimedia Relocation. Relocate digital media on DuBois 3rd floor to DuBois basement commons.Project created per Peter GM for Campus Planning. Client: Terri Warner.
    Work Task ID: 17-100946177
    Dates:
    Fri, 12/01/2017 to Sat, 05/23/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: DuBois, 3rd Floor Multimedia Relocation. Relocate digital media on DuBois 3rd floor to DuBois basement commons.Project created per Peter GM for Campus Planning. Client: Terri Warner.

    Full Description

    DuBois, 3rd Floor Multimedia Relocation. Relocate digital media on DuBois 3rd floor to DuBois basement commons.Project created per Peter GM for Campus Planning. Client: Terri Warner.

  • Lederle GRC, Rm 367A Science Library Renovation

    Lederle GRC, Rm 367A Science Library Renovation

    Work Task ID: 
    18-100959393
    Dates: 
    Thu, 02/08/2018 to Fri, 03/20/2020
    Crew: 
    Design & Construction Management
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    Lederle Lowrise A367A Science Library,We would like to expand the instruction classroom on the third floor. In addition to creating/expanding walls, adding electrical, etc. we need to create a new HUB closet so IT can upgrade the networking infrastructure. This project to occur SUMMER 2018 so the classroom will be available FALL 2018 and must be coordinated with campus IT networking. Contact Person; Terry Warner, Terry Warner, Email: twarner@library.umass.edu, Phone: 577-1596
    Work Task ID: 18-100959393
    Dates:
    Thu, 02/08/2018 to Fri, 03/20/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: Lederle Lowrise A367A Science Library,We would like to expand the instruction classroom on the third floor. In addition to creating/expanding walls, adding electrical, etc. we need to create a new HUB closet so IT can upgrade the networking infrastructure. This project to occur SUMMER 2018 so the...

    Full Description

    Lederle Lowrise A367A Science Library,We would like to expand the instruction classroom on the third floor. In addition to creating/expanding walls, adding electrical, etc. we need to create a new HUB closet so IT can upgrade the networking infrastructure. This project to occur SUMMER 2018 so the classroom will be available FALL 2018 and must be coordinated with campus IT networking. Contact Person; Terry Warner, Terry Warner, Email: twarner@library.umass.edu, Phone: 577-1596

  • Tobin, Rms 128 and 132 Restroom Renovations

    Tobin, Rms 128 and 132 Restroom Renovations

    Work Task ID: 
    19-101033305
    Dates: 
    Tue, 04/09/2019 to Sat, 08/01/2020
    Crew: 
    Alterations Department
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    Tobin 128, 132 restrooms. Please remodel bathrooms on intersession funds. Replace tile, fixtures, lighting, partitions etc. attn. Alterations. Ben Caron 74770 Mike Mcgoldrick has new stall partitions. AHR - POS - Sheetrock and Joint compound is POS in Tobin. Behind tiles.
    Work Task ID: 19-101033305
    Dates:
    Tue, 04/09/2019 to Sat, 08/01/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: Tobin 128, 132 restrooms. Please remodel bathrooms on intersession funds. Replace tile, fixtures, lighting, partitions etc. attn. Alterations. Ben Caron 74770 Mike Mcgoldrick has new stall partitions. AHR - POS - Sheetrock and Joint compound is POS in Tobin. Behind tiles.

    Full Description

    Tobin 128, 132 restrooms. Please remodel bathrooms on intersession funds. Replace tile, fixtures, lighting, partitions etc. attn. Alterations. Ben Caron 74770 Mike Mcgoldrick has new stall partitions. AHR - POS - Sheetrock and Joint compound is POS in Tobin. Behind tiles.

  • Boyden, Rm 138 Renovations

    Boyden, Rm 138 Renovations

    Work Task ID: 
    19-200175962
    Dates: 
    Fri, 06/28/2019 to Fri, 08/28/2020
    Crew: 
    Campus Planning
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    Boyden Building 138, Renovate Varsity weight room to include painting, new floor, office space, nutrition area and equipment, Dan Markowski, Email: dmarkowski@admin.umass.edu, Phone: 413 687 1758.
    Work Task ID: 19-200175962
    Dates:
    Fri, 06/28/2019 to Fri, 08/28/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: Boyden Building 138, Renovate Varsity weight room to include painting, new floor, office space, nutrition area and equipment, Dan Markowski, Email: dmarkowski@admin.umass.edu, Phone: 413 687 1758.

    Full Description

    Boyden Building 138, Renovate Varsity weight room to include painting, new floor, office space, nutrition area and equipment, Dan Markowski, Email: dmarkowski@admin.umass.edu, Phone: 413 687 1758.

  • DuBois, Floors 10, 16, 19, and 22 Carrel Rooms Renew

    DuBois, Floors 10, 16, 19, and 22 Carrel Rooms Renew

    Work Task ID: 
    19-200257536
    Dates: 
    Tue, 07/02/2019 to Mon, 06/29/2020
    Crew: 
    Alterations Department
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    Dubois, Carrel room refresh. A total of 377 carrel rooms on floors 10,16,19,22,25 need refresh. New counters, paint, and replacement of carpet with tile. To be done in stages. Req. Sheryl Crowe
    Work Task ID: 19-200257536
    Dates:
    Tue, 07/02/2019 to Mon, 06/29/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: Dubois, Carrel room refresh. A total of 377 carrel rooms on floors 10,16,19,22,25 need refresh. New counters, paint, and replacement of carpet with tile. To be done in stages. Req. Sheryl Crowe

    Full Description

    Dubois, Carrel room refresh. A total of 377 carrel rooms on floors 10,16,19,22,25 need refresh. New counters, paint, and replacement of carpet with tile. To be done in stages. Req. Sheryl Crowe

  • Campus, Kleeberg HVAC Trade Labor Contract FY19-FY20

    Campus, Kleeberg HVAC Trade Labor Contract FY19-FY20

    Work Task ID: 
    19-200293225
    Dates: 
    Fri, 07/12/2019 to Sun, 07/12/2020
    Crew: 
    BM Estimating
    Building: 
    Campus
    Requested For: 
    Andrew Thibault
    Status: 
    Open
    Description: 
    Campus, Kleeberg HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.
    Work Task ID: 19-200293225
    Dates:
    Fri, 07/12/2019 to Sun, 07/12/2020
    Requested For:
    Andrew Thibault
    Status:
    Open
    Description: Campus, Kleeberg HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.

    Full Description

    Campus, Kleeberg HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.

  • Campus, TJ Conway HVAC Trade Labor Contract FY19-FY20

    Campus, TJ Conway HVAC Trade Labor Contract FY19-FY20

    Work Task ID: 
    19-200293224
    Dates: 
    Fri, 07/12/2019 to Sun, 07/12/2020
    Crew: 
    BM Estimating
    Building: 
    Campus
    Requested For: 
    Andrew Thibault
    Status: 
    Open
    Description: 
    Campus, TJ Conway HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.
    Work Task ID: 19-200293224
    Dates:
    Fri, 07/12/2019 to Sun, 07/12/2020
    Requested For:
    Andrew Thibault
    Status:
    Open
    Description: Campus, TJ Conway HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.

    Full Description

    Campus, TJ Conway HVAC Trade Labor Contract. FY19-FY20. Mech Estimating. Req: Andy Thibault.

  • CHECK AND MONITOR ALL BUILDING OPERATING

    CHECK AND MONITOR ALL BUILDING OPERATING

    Work Task ID: 
    19-200296868
    Dates: 
    Wed, 07/24/2019 to Fri, 07/31/2020
    Crew: 
    BM Tech Services
    Building: 
    Campus
    Requested For: 
    Jeffrey Yestramski
    Status: 
    Open
    Description: 
    CHECK AND MONITOR ALL BUILDING OPERATING SYSTEMS FOR CONTROLS FOR ALL ZONES
    Work Task ID: 19-200296868
    Dates:
    Wed, 07/24/2019 to Fri, 07/31/2020
    Requested For:
    Jeffrey Yestramski
    Status:
    Open
    Description: CHECK AND MONITOR ALL BUILDING OPERATING SYSTEMS FOR CONTROLS FOR ALL ZONES

    Full Description

    CHECK AND MONITOR ALL BUILDING OPERATING SYSTEMS FOR CONTROLS FOR ALL ZONES

  • ZONE-5 DAILY EQUIPMENT CHECK ( HEAD-END )

    ZONE-5 DAILY EQUIPMENT CHECK ( HEAD-END )

    Work Task ID: 
    19-200296867
    Dates: 
    Wed, 07/24/2019 to Fri, 07/31/2020
    Crew: 
    BM Tech Services
    Building: 
    Campus
    Requested For: 
    Jeffrey Yestramski
    Status: 
    Open
    Description: 
    ZONE-5 DAILY EQUIPMENT CHECK ( HEAD-END ) TO CHECK ZONE FIVE AREA
    Work Task ID: 19-200296867
    Dates:
    Wed, 07/24/2019 to Fri, 07/31/2020
    Requested For:
    Jeffrey Yestramski
    Status:
    Open
    Description: ZONE-5 DAILY EQUIPMENT CHECK ( HEAD-END ) TO CHECK ZONE FIVE AREA

    Full Description

    ZONE-5 DAILY EQUIPMENT CHECK ( HEAD-END ) TO CHECK ZONE FIVE AREA

  • Lincoln CC and Hotel - WT for FASS SIN support 07/31/2019 10pm

    Lincoln CC and Hotel - WT for FASS SIN support 07/31/2019 10pm

    Work Task ID: 
    19-200296860
    Dates: 
    Thu, 08/01/2019 to Sun, 03/01/2026
    Crew: 
    BM FASS
    Building: 
    Campus
    Requested For: 
    Cheryl Kim Jaworski-Bruschi
    Status: 
    Open
    Description: 
    Lincoln CC and Hotel - WT for FASS SIN support 07/31/2019 10pm - 08/01/2019 5am. FASS to monitor panel for alarms when the fire pump loses pressure. To isolate and cap an existing water line that is tied to the main Domestic Water and Fire Protection feed to LCC/Hotel. This line was assumed to be abandoned and to be removed. Investigation proved that it is currently a live line and needs to be removed. Contact C. Kim Jaworski-Bruschi 413-345-8020 for additional information.
    Work Task ID: 19-200296860
    Dates:
    Thu, 08/01/2019 to Sun, 03/01/2026
    Requested For:
    Cheryl Kim Jaworski-Bruschi
    Status:
    Open
    Description: Lincoln CC and Hotel - WT for FASS SIN support 07/31/2019 10pm - 08/01/2019 5am. FASS to monitor panel for alarms when the fire pump loses pressure. To isolate and cap an existing water line that is tied to the main Domestic Water and Fire Protection feed to LCC/Hotel. This line was assumed to...

    Full Description

    Lincoln CC and Hotel - WT for FASS SIN support 07/31/2019 10pm - 08/01/2019 5am. FASS to monitor panel for alarms when the fire pump loses pressure. To isolate and cap an existing water line that is tied to the main Domestic Water and Fire Protection feed to LCC/Hotel. This line was assumed to be abandoned and to be removed. Investigation proved that it is currently a live line and needs to be removed. Contact C. Kim Jaworski-Bruschi 413-345-8020 for additional information.

  • Boyden, Men's Soccer Locker Room Renovations

    Boyden, Men's Soccer Locker Room Renovations

    Work Task ID: 
    19-200297921
    Dates: 
    Tue, 08/06/2019 to Fri, 08/28/2020
    Crew: 
    Design & Construction Management
    Building: 
    Campus
    Requested For: 
    Workplace Operations User
    Status: 
    Open
    Description: 
    Boyden Men's General Locker Room 101, We are looking at starting the process of moving our men's soccer locker room to a portion of the men's general locker room in Boyden. It would include new walls, lockers, flooring, among others. Thank you , Anthony Rosati, Email: anthonyrosat@umass.edu, Phone: 8606344345,
    Work Task ID: 19-200297921
    Dates:
    Tue, 08/06/2019 to Fri, 08/28/2020
    Requested For:
    Workplace Operations User
    Status:
    Open
    Description: Boyden Men's General Locker Room 101, We are looking at starting the process of moving our men's soccer locker room to a portion of the men's general locker room in Boyden. It would include new walls, lockers, flooring, among others. Thank you , Anthony Rosati, Email: anthonyrosat@...

    Full Description

    Boyden Men's General Locker Room 101, We are looking at starting the process of moving our men's soccer locker room to a portion of the men's general locker room in Boyden. It would include new walls, lockers, flooring, among others. Thank you , Anthony Rosati, Email: anthonyrosat@umass.edu, Phone: 8606344345,

  • Campus, Hand Dryers Wintersession FY20

    Campus, Hand Dryers Wintersession FY20

    Work Task ID: 
    19-200448620
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    Grounds Custodial
    Building: 
    Campus
    Requested For: 
    Pamela Monn
    Status: 
    Open
    Description: 
    Campus, Hand Dryers Wintersession FY20
    Work Task ID: 19-200448620
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Pamela Monn
    Status:
    Open
    Description: Campus, Hand Dryers Wintersession FY20

    Full Description

    Campus, Hand Dryers Wintersession FY20

  • Campus, Hydration Stations Wintersession FY20

    Campus, Hydration Stations Wintersession FY20

    Work Task ID: 
    19-200448615
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    BM Estimating
    Building: 
    Campus
    Requested For: 
    Andrew Thibault
    Status: 
    Open
    Description: 
    Campus, Hydration Stations Wintersession FY20
    Work Task ID: 19-200448615
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Andrew Thibault
    Status:
    Open
    Description: Campus, Hydration Stations Wintersession FY20

    Full Description

    Campus, Hydration Stations Wintersession FY20

  • Campus, Matting Wintersession FY20

    Campus, Matting Wintersession FY20

    Work Task ID: 
    19-200448619
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    Grounds Custodial
    Building: 
    Campus
    Requested For: 
    Pamela Monn
    Status: 
    Open
    Description: 
    Campus, Matting Wintersession FY20
    Work Task ID: 19-200448619
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Pamela Monn
    Status:
    Open
    Description: Campus, Matting Wintersession FY20

    Full Description

    Campus, Matting Wintersession FY20

  • Campus, Shades and Blinds Wintersession FY20

    Campus, Shades and Blinds Wintersession FY20

    Work Task ID: 
    19-200448614
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    BM Estimating
    Building: 
    Campus
    Requested For: 
    Steve Coltman
    Status: 
    Open
    Description: 
    Campus, Shades and Blinds Wintersession FY20
    Work Task ID: 19-200448614
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Steve Coltman
    Status:
    Open
    Description: Campus, Shades and Blinds Wintersession FY20

    Full Description

    Campus, Shades and Blinds Wintersession FY20

  • Campus, Upholstery Wintersession FY20

    Campus, Upholstery Wintersession FY20

    Work Task ID: 
    19-200448617
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    Grounds Custodial
    Building: 
    Campus
    Requested For: 
    Pamela Monn
    Status: 
    Open
    Description: 
    Campus, Upholstery Wintersession FY20
    Work Task ID: 19-200448617
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Pamela Monn
    Status:
    Open
    Description: Campus, Upholstery Wintersession FY20

    Full Description

    Campus, Upholstery Wintersession FY20

Chenoweth Laboratory Addition

  • AHR - Chenoweth, Rm 220 NFH Renew and HVAC

    AHR - Chenoweth, Rm 220 NFH Renew and HVAC

    Work Task ID: 
    19-200292907
    Dates: 
    Mon, 07/08/2019 to Thu, 07/09/2020
    Crew: 
    CS/WM Estimating & Scheduling
    Building: 
    Chenoweth Laboratory Addition
    Floor: 
    02
    Space: 
    220
    Requested For: 
    Jean Alamed
    Status: 
    Open
    Description: 
    Chenoweth 220, Faculty office needs repairs. A newly hired faculty will occupy this office in August 2019. The cement floor & tiles are cracked. Both need to be repaired. The tiles/tile glue probably contain asbestos. The walls also need painting - the standard color offices are painted. The room does not have reliable heat. Please look into minisplits or another source of heat/AC. There is furniture that needs to be removed and the moving services request for furniture removal was submitted on June 7th by David Prodanas (dprodana@foodsci.umass.edu). Thank you. If you have any questions please feel free to contact Jean Alamed (office 227, 5-5846) or Dave Prodanas (office 127, 5-1013). , Jean Alamed, Email: jalamed@foodsci.umass.edu, Phone: 4135455846 AHR - POS. DM. asbestos vinyl floor tile and associated mastic.
    Work Task ID: 19-200292907
    Dates:
    Mon, 07/08/2019 to Thu, 07/09/2020
    Requested For:
    Jean Alamed
    Status:
    Open
    Description: Chenoweth 220, Faculty office needs repairs. A newly hired faculty will occupy this office in August 2019. The cement floor & tiles are cracked. Both need to be repaired. The tiles/tile glue probably contain asbestos. The walls also need painting - the standard color offices are painted....

    Full Description

    Chenoweth 220, Faculty office needs repairs. A newly hired faculty will occupy this office in August 2019. The cement floor & tiles are cracked. Both need to be repaired. The tiles/tile glue probably contain asbestos. The walls also need painting - the standard color offices are painted. The room does not have reliable heat. Please look into minisplits or another source of heat/AC. There is furniture that needs to be removed and the moving services request for furniture removal was submitted on June 7th by David Prodanas (dprodana@foodsci.umass.edu). Thank you. If you have any questions please feel free to contact Jean Alamed (office 227, 5-5846) or Dave Prodanas (office 127, 5-1013). , Jean Alamed, Email: jalamed@foodsci.umass.edu, Phone: 4135455846 AHR - POS. DM. asbestos vinyl floor tile and associated mastic.

DuBois Library

  • DuBois 11th/12th - graffiti block mural

    DuBois 11th/12th - graffiti block mural

    Work Task ID: 
    19-200292863
    Dates: 
    Wed, 07/10/2019 to Mon, 01/12/2037
    Crew: 
    BM 3rd Shift Crew
    Building: 
    DuBois Library
    Requested For: 
    Sheryl Crowe
    Status: 
    Open
    Description: 
    DuBois 11th/12th floor stairwell landing - graffiti block over newly painted mural. REQ: Sheryl Crowe/7-3429
    Work Task ID: 19-200292863
    Dates:
    Wed, 07/10/2019 to Mon, 01/12/2037
    Requested For:
    Sheryl Crowe
    Status:
    Open
    Description: DuBois 11th/12th floor stairwell landing - graffiti block over newly painted mural. REQ: Sheryl Crowe/7-3429

    Full Description

    DuBois 11th/12th floor stairwell landing - graffiti block over newly painted mural. REQ: Sheryl Crowe/7-3429

Mullins Memorial Center

Skinner Hall

Chandler Laboratory

  • Chandler Lab, Controls Upgrade Wintersession FY20

    Chandler Lab, Controls Upgrade Wintersession FY20

    Work Task ID: 
    19-200448613
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    Building Maintenance
    Building: 
    Chandler Laboratory
    Requested For: 
    Fidele Mazimpaka
    Status: 
    Open
    Description: 
    Chandler Lab, Controls Upgrade Wintersession FY20.Attn: Fidele
    Work Task ID: 19-200448613
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Fidele Mazimpaka
    Status:
    Open
    Description: Chandler Lab, Controls Upgrade Wintersession FY20.Attn: Fidele

    Full Description

    Chandler Lab, Controls Upgrade Wintersession FY20.Attn: Fidele

Herter Hall

  • Herter, Building Rekey Wintersession FY20

    Herter, Building Rekey Wintersession FY20

    Work Task ID: 
    19-200448612
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    BM Lock Shop
    Building: 
    Herter Hall
    Requested For: 
    Robert Hartwright
    Status: 
    Open
    Description: 
    Herter, Building Rekey Wintersession FY20
    Work Task ID: 19-200448612
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Robert Hartwright
    Status:
    Open
    Description: Herter, Building Rekey Wintersession FY20

    Full Description

    Herter, Building Rekey Wintersession FY20

Physical Plant Building

  • Morrill Greenhouse, Growth Chambers Wintersession FY20

    Morrill Greenhouse, Growth Chambers Wintersession FY20

    Work Task ID: 
    19-200448616
    Dates: 
    Thu, 11/14/2019 to Sat, 11/14/2020
    Crew: 
    Building Maintenance
    Building: 
    Physical Plant Building
    Floor: 
    02
    Space: 
    228
    Requested For: 
    Mark Caron
    Status: 
    Open
    Description: 
    Morrill Greenhouse, Growth Chambers Wintersession FY20Attn: Fidele
    Work Task ID: 19-200448616
    Dates:
    Thu, 11/14/2019 to Sat, 11/14/2020
    Requested For:
    Mark Caron
    Status:
    Open
    Description: Morrill Greenhouse, Growth Chambers Wintersession FY20Attn: Fidele