Facilities & Campus Services

Work Information Resource Center

May 2017

Sun Mon Tue Wed Thu Fri Sat
30
1
2
3
4
5
6
 
«
Alt Secondary WT: Lederle GRC, Physics High...

Alt Secondary WT: Lederle GRC, Physics High Energy NFH - REQ 54167

Work Task ID: 
17-100842797
Dates: 
Thu, 01/05/2017 to Fri, 12/29/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Lederle GRC, Physics High Energy New Hire - REQ 54167 Scope: LGRT Ofc 928 & north half for Lab 927. Renovations budget of <$20. No chemical work in lab. Due to timing, much of renovations happen in same space ahead of this hire under 2016 hire Hertel. Detailed scope by DCM TBD. No work to start until final candidate hired. Date to begin design or Alterations work around January 2017. Expect hire on campus 9/2018. Peter Gray-Mullen as AD, Gatean Blais as PM, Betsy Blunt as support, Alt PM: Mike Aldrich.
»
«
Boyden Gym Room 169 Women's Shower

Boyden Gym Room 169 Women's Shower

Work Task ID: 
17-100840903
Dates: 
Wed, 07/17/2013 to Fri, 07/21/2017
Building: 
Boyden Gymnasium
Floor: 
01
Space: 
169
Requested For: 
David Wilson
Status: 
Open
Description: 
Boyden Gym Room 169 Women's Shower - Plaster ceiling falling down REQ: David Wilson dmwil0@facil.umass.edu 545-4227 E-002710AHR - NEG. DM. (1012995)
»
«
Conte, Rm B642 Cabinet

Conte, Rm B642 Cabinet

Work Task ID: 
16-100706736
Dates: 
Sat, 04/29/2017 to Mon, 07/10/2017
Building: 
Conte Polymer Research Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Conte Polymer Research B642, The cabinet under the second sink from the door needs to be replaced. There was a fire accident 4 years ago and the cabinet was never replaced. REQ: George Chang, Email: cchang90@research.umass.edu, Phone: 4136953558 AHR NEG (this was originally WT672550 for Zone 1. John L. suggested this work go to Alterations - njm)
»
George Parks Band Building / Grinnell Arena: Deep...

George Parks Band Building / Grinnell Arena: Deep Cleaning

Work Task ID: 
16-100805220
Dates: 
Mon, 05/01/2017 to Sat, 05/27/2017
Building: 
Parks, George N. Minuteman Marching Band Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
George Parks Band Building / Grinnell Arena: Please do a thorough cleaning of the building between Monday, 4/17 and Friday, 5/5. This is in preparation for a high-profile conference happening there starting 5/31. Please see Pam Monn with any questions. Req: Pam Monn
»
«
Goessmann, Rms 162 and 114 Office 259A NFH: Alt...

Goessmann, Rms 162 and 114 Office 259A NFH: Alt Secondary WT

Work Task ID: 
17-100842787
Dates: 
Wed, 03/29/2017 to Sun, 10/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Complete a modest renovation to Room 162 and 114 for a chemical engineering new hire Lauren Woodruff. The goal would be to complete this work by the end of calendar year 2016. The new hire will use Room 162 as main lab and 114 for tissue culture and office. Anticipated start date of Jan 22, 2017. Budget target is $100-150k but not reviewed by Alterations. Minimizing costs remains a priority.
»
«
Hadley Farm, North and South Sheds Support Beams...

Hadley Farm, North and South Sheds Support Beams and Roofs

Work Task ID: 
16-100728395
Dates: 
Sun, 04/10/2016 to Tue, 08/15/2017
Building: 
Hadley Farm Animal Agricultural Education Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hadley farm-North shed west side, need to have two support beams replaced., Gene Duda, Email: rduda@vasci.umass.edu, Phone: 237-3375 8/11/16 Scope added per Larry Merola from SR 1008965 which has been cancelled. Hadley Farm. North and South Sheds. Roofs had a rating of 25 yrs and it's been 40 yrs. Please investigate replacement of shingles on north and south sheds. The roofs are beginning to be fail. REQ: Gene Duda, rduda@vasci.umass.edu, 413.237.3375 Project name has been changed from Hadley Farm, North Shed Support Beams to Hadley Farm, North and South Sheds Support Beams and Roofs.
»
«
Lincoln CC, Blue Wall Equipment Install

Lincoln CC, Blue Wall Equipment Install

Work Task ID: 
17-100840326
Dates: 
Mon, 04/03/2017 to Mon, 08/28/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Blue Wall Equipment Install - Install new kitchen equipment Remove and cap steam line. PM: Mike Aldrich Client: Don Lamothe
»
«
Lincoln CC, Harvest Market Equipment Installation

Lincoln CC, Harvest Market Equipment Installation

Work Task ID: 
17-100826573
Dates: 
Mon, 02/06/2017 to Tue, 08/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Harvest Equipment InstallationScope: Provide electrical for new equipment.PM: Mike AldrichClient: Don Lamothe
»
«
Lincoln CC, Rm 913 HVAC

Lincoln CC, Rm 913 HVAC

Work Task ID: 
16-100690435
Dates: 
Sun, 01/15/2017 to Mon, 06/19/2017
Building: 
Lincoln Campus Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center 913, HVAC engineering design and work required. There is now DAS (Verizon project) equipment in this closet with no ventilation causing the closet to overheat. Please contact Marcin Celmer with questions and for access., Marcin Celmer, Email: marcin.celmer@umass.edu, Phone: 5-3096
»
«
Lincoln CC, U Store Renew

Lincoln CC, U Store Renew

Work Task ID: 
16-100805543
Dates: 
Thu, 12/22/2016 to Mon, 07/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center U-Store 201, Move counters for Electronics and install ceiling tiles for U-Store upgrade. Attention Mike Aldrich. This is for UESINeed a PBE estimate for funding., Donald Lamothe, Email: dlamothe@umass.edu,Phone: 577-8218
»
«
Marcus, Rm 131 Auditorium

Marcus, Rm 131 Auditorium

Work Task ID: 
15-100504614
Dates: 
Sun, 05/15/2016 to Fri, 06/30/2017
Building: 
Marcus Hall
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
MARCUS 131 auditorium. renovation project for alterations on 'classroom funding'. to include but not limited to: lighting, chairs, floors.... per dan mccarthy Bill Lizotte lights - Support PM
»
«
Mather - Moving Services Needed

Mather - Moving Services Needed

Work Task ID: 
17-100828925
Dates: 
Mon, 02/06/2017 to Fri, 06/09/2017
Building: 
Mather Building
Requested For: 
Desiree Roff
Status: 
Open
Description: 
Mather: Moving needed in support of carpet/paint project in Feb-June. 2/6 – Move contents of 119 & 119A into 101A 2/20 – Move contents of 102 back to 119 & 119A. Move contents of 122 & 122A into 101A 3/6 – Move contents of 102 back to 122 & 122A. Move contents of 120 & 121 into 101A 3/20 – Move contents of 102 back to 120 & 121. Move contents of 110 & 113 into 101A 4/3 – Move contents of 102 back to 110 & 113. Move contents of 114 & 115 into 101A 4/17 – Move contents of 102 back into 114 & 115. Move contents of 102 & 102B into 101A 5/1 – Move contents of 101A back into 102 & 102B. 5/22 – Move contents of room 200 into 101A. 6/9 – Move contents of 101A back into 200. On-site contact is Desiree Roff / 5-3930
»
«
Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Work Task ID: 
16-100766005
Dates: 
Sun, 06/12/2016 to Sat, 08/12/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Memorial Hall. Rms 5, 8, 9, 20 and corridor. Due to a recent overflow the carpet has come loose and seriosly wrinkled. These wrinkles pose a trip hazard. Please replace carpet with epoxy. January winter session or july would be best to replace the carpet. thanks Krislyn Lequin klequin@admin.umass.edusee notes/docsAHR - POS. DM. Asbestos black mastic is present in room 14, 16, 17, and the corners and edges of the hall way.
»
«
Physical Plant, Central Stores Office Build Out

Physical Plant, Central Stores Office Build Out

Work Task ID: 
17-100840363
Dates: 
Wed, 03/08/2017 to Mon, 07/03/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Physical Plant, Central Stores Office Build Out - Central Stores, Please send to Alterations. Need quote tobuild out offices., Larry, Email: lsnyder@admin.umass.edu, Phone: 5458000
»
«
Recycling Facility Barn, South Side Entry Steps

Recycling Facility Barn, South Side Entry Steps

Work Task ID: 
16-100725628
Dates: 
Mon, 04/17/2017 to Wed, 05/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Waste Management Barn Wooden steps on the back side (south-side), These steps are degrading and a hazard. If they cannot be completely replaced at this time, please perform the following work as an immediate measure: Replace the bottom step, and the first board of the top landing -- the edges of these are crumbling and rotten. This is the only entrance on that side (with steps) -- the overhead door entrances are for the trucks. Please contact the Physical Plant Safety Office at 545-4192 if more details are needed. Thank you., Sondra Slesinski, Email: sslesins@ehs.umass.edu, Phone: 413-545-4192Per Larry Merola. UMAPP Alterations to investigate and evaluate the work area to determine the scope of work and as necessary apply for permit(s). = Appears to be on the PEB (Barn) and is not in the scope of work for our Recycling Trailer project.
»
«
Stockbridge House, Gutter

Stockbridge House, Gutter

Work Task ID: 
16-100690437
Dates: 
Tue, 01/12/2016 to Fri, 06/16/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Stockbridge House. (University Club). Please patch/enclose area of roof/gutter where rodents often nest. (see pic). REQ: Valerie Maurer, vmaurer@umass.edu, 7-8114
»
«
Stockbridge, back side of Stockbridge (North),...

Stockbridge, back side of Stockbridge (North), outside install gravel

Work Task ID: 
17-100848555
Dates: 
Fri, 04/21/2017 to Mon, 07/31/2017
Building: 
Stockbridge Hall
Requested For: 
Daniel Poirier
Status: 
Open
Description: 
Stockbridge, back side of Stockbridge (North), outside. To prevent water from seeping into rms 15, 17, and 40; please pitch dirt from basement windows down to sidewalk, install gravel to pitch toward sidewalk. (SEE PICS attached) See Dan Poirer for more specifics. REQ: Dan Poirier, dpoirier@facil.umass.edu, 413.362.9932.
»
«
UHC, Entrance Flooring

UHC, Entrance Flooring

Work Task ID: 
16-100702054
Dates: 
Wed, 01/27/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS Ground floor entrance, Please remove glued-down floor mat that is in the vestibule between the outer and inner ground floor door. If this requires an asbestos abatement, please remove the underlying tile and replace it with the same tileas the rest of the ground floor.can this be done over the january break along with the other flooring projects? , Linda Rotondi , Email: lfr@uhs.umass.edu, Phone: 7- 5205AHR - POS - There is black asbestos mastic still under this carpet along the edges and all corners that should be removed by ESU before new material is installed.
»
«
UHC, Rms 10 & 351 Flooring

UHC, Rms 10 & 351 Flooring

Work Task ID: 
16-100714206
Dates: 
Tue, 03/08/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS 351, Replace carper t with vinyl tile. Requires asbestos abatment. Please include this in the big third floor carpet/ tile project that JJ Anliker will be doing this summer. About 180 square feet. Scope added from 1007777 UHS see below, Replace worn carpeting and pink tile floor in Specialty Clinic areas (room 10). About 1800 square feet. Can it be done this summer? , Linda Rotondi, Email: lfr@uhs.umass.edu, Phone: 577-5205
»
«
Waste Water Treatment Plant (Pilot Plant)- various

Waste Water Treatment Plant (Pilot Plant)- various

Work Task ID: 
17-100845128
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment Plant (Pilot Plant) - Construction Services support for the following:-Move bridge pieces-move loam-regrade-run pipe to Mill RiverREQ: Pam Monn/5-1270
»
«
Waste Water Treatment plant - Install picnic table

Waste Water Treatment plant - Install picnic table

Work Task ID: 
17-100845129
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment (Pilot Plant) - pour pad and install campus standard picnic table. REQ: Pam Monn/5-1270
»
«
Whitmore 3rd floor - ESU support for project

Whitmore 3rd floor - ESU support for project

Work Task ID: 
17-100835416
Dates: 
Fri, 02/10/2017 to Wed, 05/31/2017
Building: 
Whitmore Hall
Requested For: 
Michael Aldrich
Status: 
Open
Description: 
Whitmore, Reconfigure Rms 330, 330A, 343, 347 & 349C - Add ESU to remove asbestos containing mastic, tile and wall panels. Work to be performed 2/11 - 2/12. A&F new hire
»
«
Whitmore, Rm 255 Renovation

Whitmore, Rm 255 Renovation

Work Task ID: 
16-100802364
Dates: 
Mon, 03/20/2017 to Mon, 09/18/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Whitmore 255, Would like an estimate to rebuild conference room walls we have in 255 to make it sound proof., Eva Zilinski, Email: ez@finaid.umass.edu, Phone: 545-0356
»
 
 
 
 
 
 
7
8
9
10
11
12
13
«
Alt Secondary WT: Lederle GRC, Physics High...

Alt Secondary WT: Lederle GRC, Physics High Energy NFH - REQ 54167

Work Task ID: 
17-100842797
Dates: 
Thu, 01/05/2017 to Fri, 12/29/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Lederle GRC, Physics High Energy New Hire - REQ 54167 Scope: LGRT Ofc 928 & north half for Lab 927. Renovations budget of <$20. No chemical work in lab. Due to timing, much of renovations happen in same space ahead of this hire under 2016 hire Hertel. Detailed scope by DCM TBD. No work to start until final candidate hired. Date to begin design or Alterations work around January 2017. Expect hire on campus 9/2018. Peter Gray-Mullen as AD, Gatean Blais as PM, Betsy Blunt as support, Alt PM: Mike Aldrich.
»
«
Boyden Gym Room 169 Women's Shower

Boyden Gym Room 169 Women's Shower

Work Task ID: 
17-100840903
Dates: 
Wed, 07/17/2013 to Fri, 07/21/2017
Building: 
Boyden Gymnasium
Floor: 
01
Space: 
169
Requested For: 
David Wilson
Status: 
Open
Description: 
Boyden Gym Room 169 Women's Shower - Plaster ceiling falling down REQ: David Wilson dmwil0@facil.umass.edu 545-4227 E-002710AHR - NEG. DM. (1012995)
»
«
Conte, Rm B642 Cabinet

Conte, Rm B642 Cabinet

Work Task ID: 
16-100706736
Dates: 
Sat, 04/29/2017 to Mon, 07/10/2017
Building: 
Conte Polymer Research Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Conte Polymer Research B642, The cabinet under the second sink from the door needs to be replaced. There was a fire accident 4 years ago and the cabinet was never replaced. REQ: George Chang, Email: cchang90@research.umass.edu, Phone: 4136953558 AHR NEG (this was originally WT672550 for Zone 1. John L. suggested this work go to Alterations - njm)
»
«
George Parks Band Building / Grinnell Arena: Deep...

George Parks Band Building / Grinnell Arena: Deep Cleaning

Work Task ID: 
16-100805220
Dates: 
Mon, 05/01/2017 to Sat, 05/27/2017
Building: 
Parks, George N. Minuteman Marching Band Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
George Parks Band Building / Grinnell Arena: Please do a thorough cleaning of the building between Monday, 4/17 and Friday, 5/5. This is in preparation for a high-profile conference happening there starting 5/31. Please see Pam Monn with any questions. Req: Pam Monn
»
«
Goessmann, Rms 162 and 114 Office 259A NFH: Alt...

Goessmann, Rms 162 and 114 Office 259A NFH: Alt Secondary WT

Work Task ID: 
17-100842787
Dates: 
Wed, 03/29/2017 to Sun, 10/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Complete a modest renovation to Room 162 and 114 for a chemical engineering new hire Lauren Woodruff. The goal would be to complete this work by the end of calendar year 2016. The new hire will use Room 162 as main lab and 114 for tissue culture and office. Anticipated start date of Jan 22, 2017. Budget target is $100-150k but not reviewed by Alterations. Minimizing costs remains a priority.
»
«
Hadley Farm, North and South Sheds Support Beams...

Hadley Farm, North and South Sheds Support Beams and Roofs

Work Task ID: 
16-100728395
Dates: 
Sun, 04/10/2016 to Tue, 08/15/2017
Building: 
Hadley Farm Animal Agricultural Education Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hadley farm-North shed west side, need to have two support beams replaced., Gene Duda, Email: rduda@vasci.umass.edu, Phone: 237-3375 8/11/16 Scope added per Larry Merola from SR 1008965 which has been cancelled. Hadley Farm. North and South Sheds. Roofs had a rating of 25 yrs and it's been 40 yrs. Please investigate replacement of shingles on north and south sheds. The roofs are beginning to be fail. REQ: Gene Duda, rduda@vasci.umass.edu, 413.237.3375 Project name has been changed from Hadley Farm, North Shed Support Beams to Hadley Farm, North and South Sheds Support Beams and Roofs.
»
«
Lincoln CC, Blue Wall Equipment Install

Lincoln CC, Blue Wall Equipment Install

Work Task ID: 
17-100840326
Dates: 
Mon, 04/03/2017 to Mon, 08/28/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Blue Wall Equipment Install - Install new kitchen equipment Remove and cap steam line. PM: Mike Aldrich Client: Don Lamothe
»
«
Lincoln CC, Harvest Market Equipment Installation

Lincoln CC, Harvest Market Equipment Installation

Work Task ID: 
17-100826573
Dates: 
Mon, 02/06/2017 to Tue, 08/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Harvest Equipment InstallationScope: Provide electrical for new equipment.PM: Mike AldrichClient: Don Lamothe
»
«
Lincoln CC, Rm 913 HVAC

Lincoln CC, Rm 913 HVAC

Work Task ID: 
16-100690435
Dates: 
Sun, 01/15/2017 to Mon, 06/19/2017
Building: 
Lincoln Campus Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center 913, HVAC engineering design and work required. There is now DAS (Verizon project) equipment in this closet with no ventilation causing the closet to overheat. Please contact Marcin Celmer with questions and for access., Marcin Celmer, Email: marcin.celmer@umass.edu, Phone: 5-3096
»
«
Lincoln CC, U Store Renew

Lincoln CC, U Store Renew

Work Task ID: 
16-100805543
Dates: 
Thu, 12/22/2016 to Mon, 07/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center U-Store 201, Move counters for Electronics and install ceiling tiles for U-Store upgrade. Attention Mike Aldrich. This is for UESINeed a PBE estimate for funding., Donald Lamothe, Email: dlamothe@umass.edu,Phone: 577-8218
»
«
Marcus, Rm 131 Auditorium

Marcus, Rm 131 Auditorium

Work Task ID: 
15-100504614
Dates: 
Sun, 05/15/2016 to Fri, 06/30/2017
Building: 
Marcus Hall
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
MARCUS 131 auditorium. renovation project for alterations on 'classroom funding'. to include but not limited to: lighting, chairs, floors.... per dan mccarthy Bill Lizotte lights - Support PM
»
«
Mather - Moving Services Needed

Mather - Moving Services Needed

Work Task ID: 
17-100828925
Dates: 
Mon, 02/06/2017 to Fri, 06/09/2017
Building: 
Mather Building
Requested For: 
Desiree Roff
Status: 
Open
Description: 
Mather: Moving needed in support of carpet/paint project in Feb-June. 2/6 – Move contents of 119 & 119A into 101A 2/20 – Move contents of 102 back to 119 & 119A. Move contents of 122 & 122A into 101A 3/6 – Move contents of 102 back to 122 & 122A. Move contents of 120 & 121 into 101A 3/20 – Move contents of 102 back to 120 & 121. Move contents of 110 & 113 into 101A 4/3 – Move contents of 102 back to 110 & 113. Move contents of 114 & 115 into 101A 4/17 – Move contents of 102 back into 114 & 115. Move contents of 102 & 102B into 101A 5/1 – Move contents of 101A back into 102 & 102B. 5/22 – Move contents of room 200 into 101A. 6/9 – Move contents of 101A back into 200. On-site contact is Desiree Roff / 5-3930
»
«
Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Work Task ID: 
16-100766005
Dates: 
Sun, 06/12/2016 to Sat, 08/12/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Memorial Hall. Rms 5, 8, 9, 20 and corridor. Due to a recent overflow the carpet has come loose and seriosly wrinkled. These wrinkles pose a trip hazard. Please replace carpet with epoxy. January winter session or july would be best to replace the carpet. thanks Krislyn Lequin klequin@admin.umass.edusee notes/docsAHR - POS. DM. Asbestos black mastic is present in room 14, 16, 17, and the corners and edges of the hall way.
»
«
Physical Plant, Central Stores Office Build Out

Physical Plant, Central Stores Office Build Out

Work Task ID: 
17-100840363
Dates: 
Wed, 03/08/2017 to Mon, 07/03/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Physical Plant, Central Stores Office Build Out - Central Stores, Please send to Alterations. Need quote tobuild out offices., Larry, Email: lsnyder@admin.umass.edu, Phone: 5458000
»
«
Recycling Facility Barn, South Side Entry Steps

Recycling Facility Barn, South Side Entry Steps

Work Task ID: 
16-100725628
Dates: 
Mon, 04/17/2017 to Wed, 05/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Waste Management Barn Wooden steps on the back side (south-side), These steps are degrading and a hazard. If they cannot be completely replaced at this time, please perform the following work as an immediate measure: Replace the bottom step, and the first board of the top landing -- the edges of these are crumbling and rotten. This is the only entrance on that side (with steps) -- the overhead door entrances are for the trucks. Please contact the Physical Plant Safety Office at 545-4192 if more details are needed. Thank you., Sondra Slesinski, Email: sslesins@ehs.umass.edu, Phone: 413-545-4192Per Larry Merola. UMAPP Alterations to investigate and evaluate the work area to determine the scope of work and as necessary apply for permit(s). = Appears to be on the PEB (Barn) and is not in the scope of work for our Recycling Trailer project.
»
«
Stockbridge House, Gutter

Stockbridge House, Gutter

Work Task ID: 
16-100690437
Dates: 
Tue, 01/12/2016 to Fri, 06/16/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Stockbridge House. (University Club). Please patch/enclose area of roof/gutter where rodents often nest. (see pic). REQ: Valerie Maurer, vmaurer@umass.edu, 7-8114
»
«
Stockbridge, back side of Stockbridge (North),...

Stockbridge, back side of Stockbridge (North), outside install gravel

Work Task ID: 
17-100848555
Dates: 
Fri, 04/21/2017 to Mon, 07/31/2017
Building: 
Stockbridge Hall
Requested For: 
Daniel Poirier
Status: 
Open
Description: 
Stockbridge, back side of Stockbridge (North), outside. To prevent water from seeping into rms 15, 17, and 40; please pitch dirt from basement windows down to sidewalk, install gravel to pitch toward sidewalk. (SEE PICS attached) See Dan Poirer for more specifics. REQ: Dan Poirier, dpoirier@facil.umass.edu, 413.362.9932.
»
«
UHC, Entrance Flooring

UHC, Entrance Flooring

Work Task ID: 
16-100702054
Dates: 
Wed, 01/27/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS Ground floor entrance, Please remove glued-down floor mat that is in the vestibule between the outer and inner ground floor door. If this requires an asbestos abatement, please remove the underlying tile and replace it with the same tileas the rest of the ground floor.can this be done over the january break along with the other flooring projects? , Linda Rotondi , Email: lfr@uhs.umass.edu, Phone: 7- 5205AHR - POS - There is black asbestos mastic still under this carpet along the edges and all corners that should be removed by ESU before new material is installed.
»
«
UHC, Rms 10 & 351 Flooring

UHC, Rms 10 & 351 Flooring

Work Task ID: 
16-100714206
Dates: 
Tue, 03/08/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS 351, Replace carper t with vinyl tile. Requires asbestos abatment. Please include this in the big third floor carpet/ tile project that JJ Anliker will be doing this summer. About 180 square feet. Scope added from 1007777 UHS see below, Replace worn carpeting and pink tile floor in Specialty Clinic areas (room 10). About 1800 square feet. Can it be done this summer? , Linda Rotondi, Email: lfr@uhs.umass.edu, Phone: 577-5205
»
«
Waste Water Treatment Plant (Pilot Plant)- various

Waste Water Treatment Plant (Pilot Plant)- various

Work Task ID: 
17-100845128
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment Plant (Pilot Plant) - Construction Services support for the following:-Move bridge pieces-move loam-regrade-run pipe to Mill RiverREQ: Pam Monn/5-1270
»
«
Waste Water Treatment plant - Install picnic table

Waste Water Treatment plant - Install picnic table

Work Task ID: 
17-100845129
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment (Pilot Plant) - pour pad and install campus standard picnic table. REQ: Pam Monn/5-1270
»
«
Whitmore 3rd floor - ESU support for project

Whitmore 3rd floor - ESU support for project

Work Task ID: 
17-100835416
Dates: 
Fri, 02/10/2017 to Wed, 05/31/2017
Building: 
Whitmore Hall
Requested For: 
Michael Aldrich
Status: 
Open
Description: 
Whitmore, Reconfigure Rms 330, 330A, 343, 347 & 349C - Add ESU to remove asbestos containing mastic, tile and wall panels. Work to be performed 2/11 - 2/12. A&F new hire
»
«
Whitmore, Rm 255 Renovation

Whitmore, Rm 255 Renovation

Work Task ID: 
16-100802364
Dates: 
Mon, 03/20/2017 to Mon, 09/18/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Whitmore 255, Would like an estimate to rebuild conference room walls we have in 255 to make it sound proof., Eva Zilinski, Email: ez@finaid.umass.edu, Phone: 545-0356
»
 
Bartlett EO&D Spaces. Request Carpenter

Bartlett EO&D Spaces. Request Carpenter

Work Task ID: 
17-100850975
Dates: 
Mon, 05/08/2017 to Sun, 06/11/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett EO&D Spaces. Request carpenter (with ESU assistance as required) to perform the tasks (see Notes and Docs tab for full scope) in Bartlett Hall, preferably before June 12, when service contract painting is likely to begin. CP Project: Campus, CICS Accommodations - 1013481.PM: Marshall, Doug.
»
Hasbrouck, Rms 201, 201A, 202, 204 and 206...

Hasbrouck, Rms 201, 201A, 202, 204 and 206 Teaching Lab Renovations

Work Task ID: 
16-100767901
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hasbrouck, Rms 201, 201A, 202, 204, 206, Physics Teaching Lab Reno - Remove wall between 204 & 206, add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall between 201 and 202. add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall structure around 201A and finish the back wall at 201/202. This renovation needs to be done summer 2017 and is a copy of what we did with Alterations in the summer of 2016., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
Morrill IV, Rm N303 Teaching Lab Renovation

Morrill IV, Rm N303 Teaching Lab Renovation

Work Task ID: 
16-100767902
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Morrill 4, N303, Teaching Lab Renovation - Please replace floor, paint walls, replace lighting, add troph sinks at either end of room, backflow preventer may have to move, enclose the compressor outside the cold room, add white boards, projection and podium, replace lab benchs. This renovation is a continuation of the renovation we did in the summer of 2016 of teaching lab 301 and needs to be done in the summer of 2017., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
 
 
 
 
 
 
14
15
16
17
18
19
20
«
Alt Secondary WT: Lederle GRC, Physics High...

Alt Secondary WT: Lederle GRC, Physics High Energy NFH - REQ 54167

Work Task ID: 
17-100842797
Dates: 
Thu, 01/05/2017 to Fri, 12/29/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Lederle GRC, Physics High Energy New Hire - REQ 54167 Scope: LGRT Ofc 928 & north half for Lab 927. Renovations budget of <$20. No chemical work in lab. Due to timing, much of renovations happen in same space ahead of this hire under 2016 hire Hertel. Detailed scope by DCM TBD. No work to start until final candidate hired. Date to begin design or Alterations work around January 2017. Expect hire on campus 9/2018. Peter Gray-Mullen as AD, Gatean Blais as PM, Betsy Blunt as support, Alt PM: Mike Aldrich.
»
«
Bartlett EO&D Spaces. Request Carpenter

Bartlett EO&D Spaces. Request Carpenter

Work Task ID: 
17-100850975
Dates: 
Mon, 05/08/2017 to Sun, 06/11/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett EO&D Spaces. Request carpenter (with ESU assistance as required) to perform the tasks (see Notes and Docs tab for full scope) in Bartlett Hall, preferably before June 12, when service contract painting is likely to begin. CP Project: Campus, CICS Accommodations - 1013481.PM: Marshall, Doug.
»
«
Boyden Gym Room 169 Women's Shower

Boyden Gym Room 169 Women's Shower

Work Task ID: 
17-100840903
Dates: 
Wed, 07/17/2013 to Fri, 07/21/2017
Building: 
Boyden Gymnasium
Floor: 
01
Space: 
169
Requested For: 
David Wilson
Status: 
Open
Description: 
Boyden Gym Room 169 Women's Shower - Plaster ceiling falling down REQ: David Wilson dmwil0@facil.umass.edu 545-4227 E-002710AHR - NEG. DM. (1012995)
»
«
Conte, Rm B642 Cabinet

Conte, Rm B642 Cabinet

Work Task ID: 
16-100706736
Dates: 
Sat, 04/29/2017 to Mon, 07/10/2017
Building: 
Conte Polymer Research Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Conte Polymer Research B642, The cabinet under the second sink from the door needs to be replaced. There was a fire accident 4 years ago and the cabinet was never replaced. REQ: George Chang, Email: cchang90@research.umass.edu, Phone: 4136953558 AHR NEG (this was originally WT672550 for Zone 1. John L. suggested this work go to Alterations - njm)
»
«
George Parks Band Building / Grinnell Arena: Deep...

George Parks Band Building / Grinnell Arena: Deep Cleaning

Work Task ID: 
16-100805220
Dates: 
Mon, 05/01/2017 to Sat, 05/27/2017
Building: 
Parks, George N. Minuteman Marching Band Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
George Parks Band Building / Grinnell Arena: Please do a thorough cleaning of the building between Monday, 4/17 and Friday, 5/5. This is in preparation for a high-profile conference happening there starting 5/31. Please see Pam Monn with any questions. Req: Pam Monn
»
«
Goessmann, Rms 162 and 114 Office 259A NFH: Alt...

Goessmann, Rms 162 and 114 Office 259A NFH: Alt Secondary WT

Work Task ID: 
17-100842787
Dates: 
Wed, 03/29/2017 to Sun, 10/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Complete a modest renovation to Room 162 and 114 for a chemical engineering new hire Lauren Woodruff. The goal would be to complete this work by the end of calendar year 2016. The new hire will use Room 162 as main lab and 114 for tissue culture and office. Anticipated start date of Jan 22, 2017. Budget target is $100-150k but not reviewed by Alterations. Minimizing costs remains a priority.
»
«
Hadley Farm, North and South Sheds Support Beams...

Hadley Farm, North and South Sheds Support Beams and Roofs

Work Task ID: 
16-100728395
Dates: 
Sun, 04/10/2016 to Tue, 08/15/2017
Building: 
Hadley Farm Animal Agricultural Education Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hadley farm-North shed west side, need to have two support beams replaced., Gene Duda, Email: rduda@vasci.umass.edu, Phone: 237-3375 8/11/16 Scope added per Larry Merola from SR 1008965 which has been cancelled. Hadley Farm. North and South Sheds. Roofs had a rating of 25 yrs and it's been 40 yrs. Please investigate replacement of shingles on north and south sheds. The roofs are beginning to be fail. REQ: Gene Duda, rduda@vasci.umass.edu, 413.237.3375 Project name has been changed from Hadley Farm, North Shed Support Beams to Hadley Farm, North and South Sheds Support Beams and Roofs.
»
«
Hasbrouck, Rms 201, 201A, 202, 204 and 206...

Hasbrouck, Rms 201, 201A, 202, 204 and 206 Teaching Lab Renovations

Work Task ID: 
16-100767901
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hasbrouck, Rms 201, 201A, 202, 204, 206, Physics Teaching Lab Reno - Remove wall between 204 & 206, add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall between 201 and 202. add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall structure around 201A and finish the back wall at 201/202. This renovation needs to be done summer 2017 and is a copy of what we did with Alterations in the summer of 2016., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Lincoln CC, Blue Wall Equipment Install

Lincoln CC, Blue Wall Equipment Install

Work Task ID: 
17-100840326
Dates: 
Mon, 04/03/2017 to Mon, 08/28/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Blue Wall Equipment Install - Install new kitchen equipment Remove and cap steam line. PM: Mike Aldrich Client: Don Lamothe
»
«
Lincoln CC, Harvest Market Equipment Installation

Lincoln CC, Harvest Market Equipment Installation

Work Task ID: 
17-100826573
Dates: 
Mon, 02/06/2017 to Tue, 08/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Harvest Equipment InstallationScope: Provide electrical for new equipment.PM: Mike AldrichClient: Don Lamothe
»
«
Lincoln CC, Rm 913 HVAC

Lincoln CC, Rm 913 HVAC

Work Task ID: 
16-100690435
Dates: 
Sun, 01/15/2017 to Mon, 06/19/2017
Building: 
Lincoln Campus Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center 913, HVAC engineering design and work required. There is now DAS (Verizon project) equipment in this closet with no ventilation causing the closet to overheat. Please contact Marcin Celmer with questions and for access., Marcin Celmer, Email: marcin.celmer@umass.edu, Phone: 5-3096
»
«
Lincoln CC, U Store Renew

Lincoln CC, U Store Renew

Work Task ID: 
16-100805543
Dates: 
Thu, 12/22/2016 to Mon, 07/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center U-Store 201, Move counters for Electronics and install ceiling tiles for U-Store upgrade. Attention Mike Aldrich. This is for UESINeed a PBE estimate for funding., Donald Lamothe, Email: dlamothe@umass.edu,Phone: 577-8218
»
«
Marcus, Rm 131 Auditorium

Marcus, Rm 131 Auditorium

Work Task ID: 
15-100504614
Dates: 
Sun, 05/15/2016 to Fri, 06/30/2017
Building: 
Marcus Hall
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
MARCUS 131 auditorium. renovation project for alterations on 'classroom funding'. to include but not limited to: lighting, chairs, floors.... per dan mccarthy Bill Lizotte lights - Support PM
»
«
Mather - Moving Services Needed

Mather - Moving Services Needed

Work Task ID: 
17-100828925
Dates: 
Mon, 02/06/2017 to Fri, 06/09/2017
Building: 
Mather Building
Requested For: 
Desiree Roff
Status: 
Open
Description: 
Mather: Moving needed in support of carpet/paint project in Feb-June. 2/6 – Move contents of 119 & 119A into 101A 2/20 – Move contents of 102 back to 119 & 119A. Move contents of 122 & 122A into 101A 3/6 – Move contents of 102 back to 122 & 122A. Move contents of 120 & 121 into 101A 3/20 – Move contents of 102 back to 120 & 121. Move contents of 110 & 113 into 101A 4/3 – Move contents of 102 back to 110 & 113. Move contents of 114 & 115 into 101A 4/17 – Move contents of 102 back into 114 & 115. Move contents of 102 & 102B into 101A 5/1 – Move contents of 101A back into 102 & 102B. 5/22 – Move contents of room 200 into 101A. 6/9 – Move contents of 101A back into 200. On-site contact is Desiree Roff / 5-3930
»
«
Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Work Task ID: 
16-100766005
Dates: 
Sun, 06/12/2016 to Sat, 08/12/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Memorial Hall. Rms 5, 8, 9, 20 and corridor. Due to a recent overflow the carpet has come loose and seriosly wrinkled. These wrinkles pose a trip hazard. Please replace carpet with epoxy. January winter session or july would be best to replace the carpet. thanks Krislyn Lequin klequin@admin.umass.edusee notes/docsAHR - POS. DM. Asbestos black mastic is present in room 14, 16, 17, and the corners and edges of the hall way.
»
«
Morrill IV, Rm N303 Teaching Lab Renovation

Morrill IV, Rm N303 Teaching Lab Renovation

Work Task ID: 
16-100767902
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Morrill 4, N303, Teaching Lab Renovation - Please replace floor, paint walls, replace lighting, add troph sinks at either end of room, backflow preventer may have to move, enclose the compressor outside the cold room, add white boards, projection and podium, replace lab benchs. This renovation is a continuation of the renovation we did in the summer of 2016 of teaching lab 301 and needs to be done in the summer of 2017., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Physical Plant, Central Stores Office Build Out

Physical Plant, Central Stores Office Build Out

Work Task ID: 
17-100840363
Dates: 
Wed, 03/08/2017 to Mon, 07/03/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Physical Plant, Central Stores Office Build Out - Central Stores, Please send to Alterations. Need quote tobuild out offices., Larry, Email: lsnyder@admin.umass.edu, Phone: 5458000
»
«
Recycling Facility Barn, South Side Entry Steps

Recycling Facility Barn, South Side Entry Steps

Work Task ID: 
16-100725628
Dates: 
Mon, 04/17/2017 to Wed, 05/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Waste Management Barn Wooden steps on the back side (south-side), These steps are degrading and a hazard. If they cannot be completely replaced at this time, please perform the following work as an immediate measure: Replace the bottom step, and the first board of the top landing -- the edges of these are crumbling and rotten. This is the only entrance on that side (with steps) -- the overhead door entrances are for the trucks. Please contact the Physical Plant Safety Office at 545-4192 if more details are needed. Thank you., Sondra Slesinski, Email: sslesins@ehs.umass.edu, Phone: 413-545-4192Per Larry Merola. UMAPP Alterations to investigate and evaluate the work area to determine the scope of work and as necessary apply for permit(s). = Appears to be on the PEB (Barn) and is not in the scope of work for our Recycling Trailer project.
»
«
Stockbridge House, Gutter

Stockbridge House, Gutter

Work Task ID: 
16-100690437
Dates: 
Tue, 01/12/2016 to Fri, 06/16/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Stockbridge House. (University Club). Please patch/enclose area of roof/gutter where rodents often nest. (see pic). REQ: Valerie Maurer, vmaurer@umass.edu, 7-8114
»
«
Stockbridge, back side of Stockbridge (North),...

Stockbridge, back side of Stockbridge (North), outside install gravel

Work Task ID: 
17-100848555
Dates: 
Fri, 04/21/2017 to Mon, 07/31/2017
Building: 
Stockbridge Hall
Requested For: 
Daniel Poirier
Status: 
Open
Description: 
Stockbridge, back side of Stockbridge (North), outside. To prevent water from seeping into rms 15, 17, and 40; please pitch dirt from basement windows down to sidewalk, install gravel to pitch toward sidewalk. (SEE PICS attached) See Dan Poirer for more specifics. REQ: Dan Poirier, dpoirier@facil.umass.edu, 413.362.9932.
»
«
UHC, Entrance Flooring

UHC, Entrance Flooring

Work Task ID: 
16-100702054
Dates: 
Wed, 01/27/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS Ground floor entrance, Please remove glued-down floor mat that is in the vestibule between the outer and inner ground floor door. If this requires an asbestos abatement, please remove the underlying tile and replace it with the same tileas the rest of the ground floor.can this be done over the january break along with the other flooring projects? , Linda Rotondi , Email: lfr@uhs.umass.edu, Phone: 7- 5205AHR - POS - There is black asbestos mastic still under this carpet along the edges and all corners that should be removed by ESU before new material is installed.
»
«
UHC, Rms 10 & 351 Flooring

UHC, Rms 10 & 351 Flooring

Work Task ID: 
16-100714206
Dates: 
Tue, 03/08/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS 351, Replace carper t with vinyl tile. Requires asbestos abatment. Please include this in the big third floor carpet/ tile project that JJ Anliker will be doing this summer. About 180 square feet. Scope added from 1007777 UHS see below, Replace worn carpeting and pink tile floor in Specialty Clinic areas (room 10). About 1800 square feet. Can it be done this summer? , Linda Rotondi, Email: lfr@uhs.umass.edu, Phone: 577-5205
»
«
Waste Water Treatment Plant (Pilot Plant)- various

Waste Water Treatment Plant (Pilot Plant)- various

Work Task ID: 
17-100845128
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment Plant (Pilot Plant) - Construction Services support for the following:-Move bridge pieces-move loam-regrade-run pipe to Mill RiverREQ: Pam Monn/5-1270
»
«
Waste Water Treatment plant - Install picnic table

Waste Water Treatment plant - Install picnic table

Work Task ID: 
17-100845129
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment (Pilot Plant) - pour pad and install campus standard picnic table. REQ: Pam Monn/5-1270
»
«
Whitmore 3rd floor - ESU support for project

Whitmore 3rd floor - ESU support for project

Work Task ID: 
17-100835416
Dates: 
Fri, 02/10/2017 to Wed, 05/31/2017
Building: 
Whitmore Hall
Requested For: 
Michael Aldrich
Status: 
Open
Description: 
Whitmore, Reconfigure Rms 330, 330A, 343, 347 & 349C - Add ESU to remove asbestos containing mastic, tile and wall panels. Work to be performed 2/11 - 2/12. A&F new hire
»
«
Whitmore, Rm 255 Renovation

Whitmore, Rm 255 Renovation

Work Task ID: 
16-100802364
Dates: 
Mon, 03/20/2017 to Mon, 09/18/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Whitmore 255, Would like an estimate to rebuild conference room walls we have in 255 to make it sound proof., Eva Zilinski, Email: ez@finaid.umass.edu, Phone: 545-0356
»
 
 
DuBOIS LIBRARY - plumber

DuBOIS LIBRARY - plumber

Work Task ID: 
17-100851756
Dates: 
Tue, 05/16/2017 to Tue, 05/30/2017
Building: 
DuBois Library
Requested For: 
Scott Ames
Status: 
Open
Description: 
DuBOIS LIBRARY - BASEMENT - DuBOIS LIBRARY, HV-2,INNER SUB BSMNT, N.E.CORNER, overheating.req.scott@56416
»
 
 
Bartlett 301, 302, 314

Bartlett 301, 302, 314

Work Task ID: 
17-100850645
Dates: 
Thu, 05/18/2017 to Fri, 05/26/2017
Building: 
Bartlett Hall
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Bartlett 301, 302, 314 - please clear tablet arm chairs out of these classrooms by 9 a.m. on May 16 for 314 and May 19 for 301 & 302. The rooms are being repurposed for ISOM and the classroom chairs are no longer needed. REQ: Liz Tousignant/7-0413
»
Cold Spring Orchard - Construction Services

Cold Spring Orchard - Construction Services

Work Task ID: 
17-100851942
Dates: 
Thu, 05/18/2017 to Mon, 07/31/2017
Building: 
Chandler Laboratory
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Cold Spring Orchard - Construction Services to support Utility Maintenance to replace a failed water line. REQ: Pam Monn/5-1270 & Tom Fydenkevez/5-6444
»
Isenberg School of Management, Alfond Hall, Mahar...

Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - SIN support

Work Task ID: 
17-100849249
Dates: 
Thu, 05/18/2017 to Thu, 08/31/2017
Building: 
Isenberg School of Management Building
Requested For: 
Stephen Lobik
Status: 
Open
Description: 
Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - Zone 5 SIN support 05/18/2017 8am - 08/31/2017 8am. Zone plumber to hut off steam valves in the mechanical rooms of the 3 buildings. Open valves at the end of the shutdown. Shutoff low pressure steam within each building to allow for demolition of existing service and equipment. Areas will be modified and prepared for new equipment and steam service being installed under this project. Because steam to HVAC reheat coils will be off Alfond and ISOM may experience colder air temperatures than normal. Hot water at toilet room sinks will also be impacted. Contact Stephen Lobik 413-326-1651 for additional information.
»
 
Flint 204B: Moving Services Needed

Flint 204B: Moving Services Needed

Work Task ID: 
17-100851323
Dates: 
Fri, 05/19/2017 to Tue, 05/30/2017
Building: 
Flint Laboratory
Floor: 
02
Space: 
204B
Requested For: 
Rebecca Chmura
Status: 
Open
Description: 
Flint 204B: Please move desk in office away from the wall to allow painters access to the area in need of work but leave it accessible as occupant will work during week painting occurs. Please move desk on Friday, May 19th and put it back against the wall on Tuesday, May 30th. Req: Sarah Long / 7-4770
»
 
 
21
22
23
24
25
26
27
«
Alt Secondary WT: Lederle GRC, Physics High...

Alt Secondary WT: Lederle GRC, Physics High Energy NFH - REQ 54167

Work Task ID: 
17-100842797
Dates: 
Thu, 01/05/2017 to Fri, 12/29/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Lederle GRC, Physics High Energy New Hire - REQ 54167 Scope: LGRT Ofc 928 & north half for Lab 927. Renovations budget of <$20. No chemical work in lab. Due to timing, much of renovations happen in same space ahead of this hire under 2016 hire Hertel. Detailed scope by DCM TBD. No work to start until final candidate hired. Date to begin design or Alterations work around January 2017. Expect hire on campus 9/2018. Peter Gray-Mullen as AD, Gatean Blais as PM, Betsy Blunt as support, Alt PM: Mike Aldrich.
»
«
Bartlett 301, 302, 314

Bartlett 301, 302, 314

Work Task ID: 
17-100850645
Dates: 
Thu, 05/18/2017 to Fri, 05/26/2017
Building: 
Bartlett Hall
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Bartlett 301, 302, 314 - please clear tablet arm chairs out of these classrooms by 9 a.m. on May 16 for 314 and May 19 for 301 & 302. The rooms are being repurposed for ISOM and the classroom chairs are no longer needed. REQ: Liz Tousignant/7-0413
 
Whitmore, Rm 370 Mixing Box

Whitmore, Rm 370 Mixing Box

Work Task ID: 
17-100850203
Dates: 
Sat, 05/27/2017 to Tue, 05/30/2017
Building: 
Whitmore Hall
Requested For: 
Robert Perry
Status: 
Open
Description: 
Building: WhitmoreRoom: Rm 370 Mixing BoxScope: Add Rupert Clark to assist w/ this projectAlt Project: Whitmore, Rm 370 Mixing Box PM: Bob PerryST#: 160804Roll up to WT#: 17-100841681
»
«
Bartlett EO&D Spaces. Request Carpenter

Bartlett EO&D Spaces. Request Carpenter

Work Task ID: 
17-100850975
Dates: 
Mon, 05/08/2017 to Sun, 06/11/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett EO&D Spaces. Request carpenter (with ESU assistance as required) to perform the tasks (see Notes and Docs tab for full scope) in Bartlett Hall, preferably before June 12, when service contract painting is likely to begin. CP Project: Campus, CICS Accommodations - 1013481.PM: Marshall, Doug.
»
«
Boyden Gym Room 169 Women's Shower

Boyden Gym Room 169 Women's Shower

Work Task ID: 
17-100840903
Dates: 
Wed, 07/17/2013 to Fri, 07/21/2017
Building: 
Boyden Gymnasium
Floor: 
01
Space: 
169
Requested For: 
David Wilson
Status: 
Open
Description: 
Boyden Gym Room 169 Women's Shower - Plaster ceiling falling down REQ: David Wilson dmwil0@facil.umass.edu 545-4227 E-002710AHR - NEG. DM. (1012995)
»
CHC E&W - 5/21/17 - Custodial Support

CHC E&W - 5/21/17 - Custodial Support

Work Task ID: 
17-100838841
Dates: 
Sun, 05/21/2017 to Sat, 08/05/2017
Building: 
Commonwealth Honors College
Floor: 
01
Space: 
160
Requested For: 
Erin O'Rourke
Status: 
Open
Description: 
CHC Events Hall, Summer Programs, Summer Pre-College programming Start Time: 05/21/2017 at 9:00 am End Time: 08/05/2017 at 9:00 am Est. # Participants: 100 Room Setup Style: Audience/Lecture StyleSetup Time: 05/21/2017 at 9:00 amBreakdown Time: 08/05/2017 at 9:00 amAdditional Setup & Services:Description of Event Needs: Reservation request is for every Sun & Wed evening between 5/21 and 8/5, from 2 - 9:30pm.For these 3 dates we will need audience-style seating, as many seats as possible, with no divider wall: 6/25, 7/9 & 7/23.All other dates will require standard setup for casual events.Dates:May 21, 24, 28, 31June 4, 7, 11, 14, 18, 21, 25, 28July 2, 5, 9, 12, 16, 19, 23, 26, 30August 2Number of participants varies depending on the day.Req. Erin O'Rourke at 577-2112, eorourke@umass.eduSpeedtype: 158951
»
«
Cold Spring Orchard - Construction Services

Cold Spring Orchard - Construction Services

Work Task ID: 
17-100851942
Dates: 
Thu, 05/18/2017 to Mon, 07/31/2017
Building: 
Chandler Laboratory
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Cold Spring Orchard - Construction Services to support Utility Maintenance to replace a failed water line. REQ: Pam Monn/5-1270 & Tom Fydenkevez/5-6444
»
«
Conte, Rm B642 Cabinet

Conte, Rm B642 Cabinet

Work Task ID: 
16-100706736
Dates: 
Sat, 04/29/2017 to Mon, 07/10/2017
Building: 
Conte Polymer Research Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Conte Polymer Research B642, The cabinet under the second sink from the door needs to be replaced. There was a fire accident 4 years ago and the cabinet was never replaced. REQ: George Chang, Email: cchang90@research.umass.edu, Phone: 4136953558 AHR NEG (this was originally WT672550 for Zone 1. John L. suggested this work go to Alterations - njm)
»
«
DuBOIS LIBRARY - plumber

DuBOIS LIBRARY - plumber

Work Task ID: 
17-100851756
Dates: 
Tue, 05/16/2017 to Tue, 05/30/2017
Building: 
DuBois Library
Requested For: 
Scott Ames
Status: 
Open
Description: 
DuBOIS LIBRARY - BASEMENT - DuBOIS LIBRARY, HV-2,INNER SUB BSMNT, N.E.CORNER, overheating.req.scott@56416
»
«
Flint 204B: Moving Services Needed

Flint 204B: Moving Services Needed

Work Task ID: 
17-100851323
Dates: 
Fri, 05/19/2017 to Tue, 05/30/2017
Building: 
Flint Laboratory
Floor: 
02
Space: 
204B
Requested For: 
Rebecca Chmura
Status: 
Open
Description: 
Flint 204B: Please move desk in office away from the wall to allow painters access to the area in need of work but leave it accessible as occupant will work during week painting occurs. Please move desk on Friday, May 19th and put it back against the wall on Tuesday, May 30th. Req: Sarah Long / 7-4770
»
«
George Parks Band Building / Grinnell Arena: Deep...

George Parks Band Building / Grinnell Arena: Deep Cleaning

Work Task ID: 
16-100805220
Dates: 
Mon, 05/01/2017 to Sat, 05/27/2017
Building: 
Parks, George N. Minuteman Marching Band Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
George Parks Band Building / Grinnell Arena: Please do a thorough cleaning of the building between Monday, 4/17 and Friday, 5/5. This is in preparation for a high-profile conference happening there starting 5/31. Please see Pam Monn with any questions. Req: Pam Monn
 
«
Goessmann, Rms 162 and 114 Office 259A NFH: Alt...

Goessmann, Rms 162 and 114 Office 259A NFH: Alt Secondary WT

Work Task ID: 
17-100842787
Dates: 
Wed, 03/29/2017 to Sun, 10/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Complete a modest renovation to Room 162 and 114 for a chemical engineering new hire Lauren Woodruff. The goal would be to complete this work by the end of calendar year 2016. The new hire will use Room 162 as main lab and 114 for tissue culture and office. Anticipated start date of Jan 22, 2017. Budget target is $100-150k but not reviewed by Alterations. Minimizing costs remains a priority.
»
«
Hadley Farm, North and South Sheds Support Beams...

Hadley Farm, North and South Sheds Support Beams and Roofs

Work Task ID: 
16-100728395
Dates: 
Sun, 04/10/2016 to Tue, 08/15/2017
Building: 
Hadley Farm Animal Agricultural Education Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hadley farm-North shed west side, need to have two support beams replaced., Gene Duda, Email: rduda@vasci.umass.edu, Phone: 237-3375 8/11/16 Scope added per Larry Merola from SR 1008965 which has been cancelled. Hadley Farm. North and South Sheds. Roofs had a rating of 25 yrs and it's been 40 yrs. Please investigate replacement of shingles on north and south sheds. The roofs are beginning to be fail. REQ: Gene Duda, rduda@vasci.umass.edu, 413.237.3375 Project name has been changed from Hadley Farm, North Shed Support Beams to Hadley Farm, North and South Sheds Support Beams and Roofs.
»
«
Hasbrouck, Rms 201, 201A, 202, 204 and 206...

Hasbrouck, Rms 201, 201A, 202, 204 and 206 Teaching Lab Renovations

Work Task ID: 
16-100767901
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hasbrouck, Rms 201, 201A, 202, 204, 206, Physics Teaching Lab Reno - Remove wall between 204 & 206, add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall between 201 and 202. add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall structure around 201A and finish the back wall at 201/202. This renovation needs to be done summer 2017 and is a copy of what we did with Alterations in the summer of 2016., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Isenberg School of Management, Alfond Hall, Mahar...

Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - SIN support

Work Task ID: 
17-100849249
Dates: 
Thu, 05/18/2017 to Thu, 08/31/2017
Building: 
Isenberg School of Management Building
Requested For: 
Stephen Lobik
Status: 
Open
Description: 
Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - Zone 5 SIN support 05/18/2017 8am - 08/31/2017 8am. Zone plumber to hut off steam valves in the mechanical rooms of the 3 buildings. Open valves at the end of the shutdown. Shutoff low pressure steam within each building to allow for demolition of existing service and equipment. Areas will be modified and prepared for new equipment and steam service being installed under this project. Because steam to HVAC reheat coils will be off Alfond and ISOM may experience colder air temperatures than normal. Hot water at toilet room sinks will also be impacted. Contact Stephen Lobik 413-326-1651 for additional information.
»
«
Lincoln CC, Blue Wall Equipment Install

Lincoln CC, Blue Wall Equipment Install

Work Task ID: 
17-100840326
Dates: 
Mon, 04/03/2017 to Mon, 08/28/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Blue Wall Equipment Install - Install new kitchen equipment Remove and cap steam line. PM: Mike Aldrich Client: Don Lamothe
»
«
Lincoln CC, Harvest Market Equipment Installation

Lincoln CC, Harvest Market Equipment Installation

Work Task ID: 
17-100826573
Dates: 
Mon, 02/06/2017 to Tue, 08/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Harvest Equipment InstallationScope: Provide electrical for new equipment.PM: Mike AldrichClient: Don Lamothe
»
«
Lincoln CC, Rm 913 HVAC

Lincoln CC, Rm 913 HVAC

Work Task ID: 
16-100690435
Dates: 
Sun, 01/15/2017 to Mon, 06/19/2017
Building: 
Lincoln Campus Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center 913, HVAC engineering design and work required. There is now DAS (Verizon project) equipment in this closet with no ventilation causing the closet to overheat. Please contact Marcin Celmer with questions and for access., Marcin Celmer, Email: marcin.celmer@umass.edu, Phone: 5-3096
»
«
Lincoln CC, U Store Renew

Lincoln CC, U Store Renew

Work Task ID: 
16-100805543
Dates: 
Thu, 12/22/2016 to Mon, 07/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center U-Store 201, Move counters for Electronics and install ceiling tiles for U-Store upgrade. Attention Mike Aldrich. This is for UESINeed a PBE estimate for funding., Donald Lamothe, Email: dlamothe@umass.edu,Phone: 577-8218
»
«
Marcus, Rm 131 Auditorium

Marcus, Rm 131 Auditorium

Work Task ID: 
15-100504614
Dates: 
Sun, 05/15/2016 to Fri, 06/30/2017
Building: 
Marcus Hall
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
MARCUS 131 auditorium. renovation project for alterations on 'classroom funding'. to include but not limited to: lighting, chairs, floors.... per dan mccarthy Bill Lizotte lights - Support PM
»
«
Mather - Moving Services Needed

Mather - Moving Services Needed

Work Task ID: 
17-100828925
Dates: 
Mon, 02/06/2017 to Fri, 06/09/2017
Building: 
Mather Building
Requested For: 
Desiree Roff
Status: 
Open
Description: 
Mather: Moving needed in support of carpet/paint project in Feb-June. 2/6 – Move contents of 119 & 119A into 101A 2/20 – Move contents of 102 back to 119 & 119A. Move contents of 122 & 122A into 101A 3/6 – Move contents of 102 back to 122 & 122A. Move contents of 120 & 121 into 101A 3/20 – Move contents of 102 back to 120 & 121. Move contents of 110 & 113 into 101A 4/3 – Move contents of 102 back to 110 & 113. Move contents of 114 & 115 into 101A 4/17 – Move contents of 102 back into 114 & 115. Move contents of 102 & 102B into 101A 5/1 – Move contents of 101A back into 102 & 102B. 5/22 – Move contents of room 200 into 101A. 6/9 – Move contents of 101A back into 200. On-site contact is Desiree Roff / 5-3930
»
«
Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Work Task ID: 
16-100766005
Dates: 
Sun, 06/12/2016 to Sat, 08/12/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Memorial Hall. Rms 5, 8, 9, 20 and corridor. Due to a recent overflow the carpet has come loose and seriosly wrinkled. These wrinkles pose a trip hazard. Please replace carpet with epoxy. January winter session or july would be best to replace the carpet. thanks Krislyn Lequin klequin@admin.umass.edusee notes/docsAHR - POS. DM. Asbestos black mastic is present in room 14, 16, 17, and the corners and edges of the hall way.
»
«
Morrill IV, Rm N303 Teaching Lab Renovation

Morrill IV, Rm N303 Teaching Lab Renovation

Work Task ID: 
16-100767902
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Morrill 4, N303, Teaching Lab Renovation - Please replace floor, paint walls, replace lighting, add troph sinks at either end of room, backflow preventer may have to move, enclose the compressor outside the cold room, add white boards, projection and podium, replace lab benchs. This renovation is a continuation of the renovation we did in the summer of 2016 of teaching lab 301 and needs to be done in the summer of 2017., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Physical Plant, Central Stores Office Build Out

Physical Plant, Central Stores Office Build Out

Work Task ID: 
17-100840363
Dates: 
Wed, 03/08/2017 to Mon, 07/03/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Physical Plant, Central Stores Office Build Out - Central Stores, Please send to Alterations. Need quote tobuild out offices., Larry, Email: lsnyder@admin.umass.edu, Phone: 5458000
»
«
Recycling Facility Barn, South Side Entry Steps

Recycling Facility Barn, South Side Entry Steps

Work Task ID: 
16-100725628
Dates: 
Mon, 04/17/2017 to Wed, 05/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Waste Management Barn Wooden steps on the back side (south-side), These steps are degrading and a hazard. If they cannot be completely replaced at this time, please perform the following work as an immediate measure: Replace the bottom step, and the first board of the top landing -- the edges of these are crumbling and rotten. This is the only entrance on that side (with steps) -- the overhead door entrances are for the trucks. Please contact the Physical Plant Safety Office at 545-4192 if more details are needed. Thank you., Sondra Slesinski, Email: sslesins@ehs.umass.edu, Phone: 413-545-4192Per Larry Merola. UMAPP Alterations to investigate and evaluate the work area to determine the scope of work and as necessary apply for permit(s). = Appears to be on the PEB (Barn) and is not in the scope of work for our Recycling Trailer project.
»
«
Stockbridge House, Gutter

Stockbridge House, Gutter

Work Task ID: 
16-100690437
Dates: 
Tue, 01/12/2016 to Fri, 06/16/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Stockbridge House. (University Club). Please patch/enclose area of roof/gutter where rodents often nest. (see pic). REQ: Valerie Maurer, vmaurer@umass.edu, 7-8114
»
«
Stockbridge, back side of Stockbridge (North),...

Stockbridge, back side of Stockbridge (North), outside install gravel

Work Task ID: 
17-100848555
Dates: 
Fri, 04/21/2017 to Mon, 07/31/2017
Building: 
Stockbridge Hall
Requested For: 
Daniel Poirier
Status: 
Open
Description: 
Stockbridge, back side of Stockbridge (North), outside. To prevent water from seeping into rms 15, 17, and 40; please pitch dirt from basement windows down to sidewalk, install gravel to pitch toward sidewalk. (SEE PICS attached) See Dan Poirer for more specifics. REQ: Dan Poirier, dpoirier@facil.umass.edu, 413.362.9932.
»
«
UHC, Entrance Flooring

UHC, Entrance Flooring

Work Task ID: 
16-100702054
Dates: 
Wed, 01/27/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS Ground floor entrance, Please remove glued-down floor mat that is in the vestibule between the outer and inner ground floor door. If this requires an asbestos abatement, please remove the underlying tile and replace it with the same tileas the rest of the ground floor.can this be done over the january break along with the other flooring projects? , Linda Rotondi , Email: lfr@uhs.umass.edu, Phone: 7- 5205AHR - POS - There is black asbestos mastic still under this carpet along the edges and all corners that should be removed by ESU before new material is installed.
»
«
UHC, Rms 10 & 351 Flooring

UHC, Rms 10 & 351 Flooring

Work Task ID: 
16-100714206
Dates: 
Tue, 03/08/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS 351, Replace carper t with vinyl tile. Requires asbestos abatment. Please include this in the big third floor carpet/ tile project that JJ Anliker will be doing this summer. About 180 square feet. Scope added from 1007777 UHS see below, Replace worn carpeting and pink tile floor in Specialty Clinic areas (room 10). About 1800 square feet. Can it be done this summer? , Linda Rotondi, Email: lfr@uhs.umass.edu, Phone: 577-5205
»
«
Waste Water Treatment Plant (Pilot Plant)- various

Waste Water Treatment Plant (Pilot Plant)- various

Work Task ID: 
17-100845128
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment Plant (Pilot Plant) - Construction Services support for the following:-Move bridge pieces-move loam-regrade-run pipe to Mill RiverREQ: Pam Monn/5-1270
»
«
Waste Water Treatment plant - Install picnic table

Waste Water Treatment plant - Install picnic table

Work Task ID: 
17-100845129
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment (Pilot Plant) - pour pad and install campus standard picnic table. REQ: Pam Monn/5-1270
»
«
Whitmore 3rd floor - ESU support for project

Whitmore 3rd floor - ESU support for project

Work Task ID: 
17-100835416
Dates: 
Fri, 02/10/2017 to Wed, 05/31/2017
Building: 
Whitmore Hall
Requested For: 
Michael Aldrich
Status: 
Open
Description: 
Whitmore, Reconfigure Rms 330, 330A, 343, 347 & 349C - Add ESU to remove asbestos containing mastic, tile and wall panels. Work to be performed 2/11 - 2/12. A&F new hire
»
«
Whitmore, Rm 255 Renovation

Whitmore, Rm 255 Renovation

Work Task ID: 
16-100802364
Dates: 
Mon, 03/20/2017 to Mon, 09/18/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Whitmore 255, Would like an estimate to rebuild conference room walls we have in 255 to make it sound proof., Eva Zilinski, Email: ez@finaid.umass.edu, Phone: 545-0356
»
 
Arnold 429 - clear out & paint - 3rd

Arnold 429 - clear out & paint - 3rd

Work Task ID: 
17-100850852
Dates: 
Mon, 05/22/2017 to Fri, 05/26/2017
Building: 
Arnold House
Floor: 
04
Space: 
429
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Arnold 429 - Disassemble the existing wall-mounted carrels (4) which will need to be disposed of (along with the desks - but leave the stand alone desk around the corner) at the WRTF, Remove the carrels, patch holes in walls, Repaint room cameo. REQ: Doug Marshall/7-1788AHR - Neg
 
 
Arnold 429 - moving services

Arnold 429 - moving services

Work Task ID: 
17-100851945
Dates: 
Mon, 05/22/2017 to Tue, 05/30/2017
Building: 
Arnold House
Floor: 
04
Space: 
429
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Arnold 429 - Moving services - please center furniture on 5/22 as best as possible for paint. Return furniture on 4/30. REQ: Liz Tousignant/7-0413 **NOTE: Room is just to the left when you get off the elevator, not in room number order**
»
elab 1 doors, paint, 3rd shift

elab 1 doors, paint, 3rd shift

Work Task ID: 
17-100838778
Dates: 
Mon, 05/22/2017 to Fri, 05/26/2017
Building: 
Engineering Shops Building
Floor: 
02
Space: 
219A
Requested For: 
Jennifer Kramer
Status: 
Open
Description: 
elab 1. all bath/fire doors. due the oils ingrained in these doors, which would be most cost effective: replace or refinish? for more info, talk with ben caron. thanks sonyaAHR - POS. DM. Some doors contain asbestos insulation.HOLD for Melissa
 
 
Flint Lab 204B - paint

Flint Lab 204B - paint

Work Task ID: 
17-100851320
Dates: 
Mon, 05/22/2017 to Fri, 05/26/2017
Building: 
Flint Laboratory
Floor: 
02
Space: 
204B
Requested For: 
Rebecca Chmura
Status: 
Open
Description: 
Flint Lab 204B, New Professor Office. She has moved in already. The walls are peeling and flaking and the ceiling has broken missing tiles. Please repair and fix. Thank you., Becky Chmura, Email: bchmura@isenberg.umass.edu, Phone: 5-1389, iNETAHR - POS. DM. Paint Lead RRP. Glue Daubs Pos Asbestos.***Ceiling to be handled separately by ESU on SR 1013558.***
 
 
LSL, Various Mech Rooms - Reprogram Fire Alarm...

LSL, Various Mech Rooms - Reprogram Fire Alarm Control Panel

Work Task ID: 
17-100852224
Dates: 
Mon, 05/22/2017 to Mon, 06/05/2017
Building: 
Life Science Laboratories
Requested For: 
Andrew Thibault
Status: 
Open
Description: 
Life Sciences Laboratory Various Mechanical Rooms, Reprogram Fire Alarm Control Panel so that when Preaction Systems #1, #2, #3, #4 and #6 are activated they cause an Alarm signal at the FACP. Preaction systems #1 - #3currently come in as a Supervisory signal when activated while #4 and #6 do not register when activated. Assign to Outside Mechanical Contractor - Simplex Grinnell.Contact: P. Volpe (413) 687-1223, Peter Volpe, Email: pvolpe@facil.umass.edu,Phone: (413) 687-1223,
»
 
Bartlett - Custodial

Bartlett - Custodial

Work Task ID: 
17-100852330
Dates: 
Tue, 05/23/2017 to Thu, 06/01/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett, Rms 07A, 07B, 07C, 07D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 and basement. Request assistance for custodial staff in Bartlett in cleaning and waxing floors for new occupants in Bartlett basement, rooms 07A, 07B, 07C, 07D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 before June 1 move-in date. (Customer was told by custodian Jeff that he needed help to complete.) CP Project: Middlesex and Hampshire House, CCPH and PBS Relocation - 1011837.PM/Phone: Marshall, Doug 5-1383.ST#: 160357.Please roll any additional Work Tasks up to WT# 16-100807750.
»
Bowditch Lodge: Wall repair needed

Bowditch Lodge: Wall repair needed

Work Task ID: 
17-100852399
Dates: 
Tue, 05/23/2017 to Tue, 06/06/2017
Building: 
Bowditch Lodge
Requested For: 
Teresa Houle
Status: 
Open
Description: 
Bowditch Lodge: The wall in the lower level restroom is pretty beat. Could the rust-colored spots be touched up with paint? A new panel would be great but I'm not sure that's possible as it would restrict access. Any work that can be done to improve the look would be appreciated. See attached photos. Req: Teresa Houle / 5-1566
»
Butterfield 217 - remove glazing/caulking

Butterfield 217 - remove glazing/caulking

Work Task ID: 
17-100851779
Dates: 
Tue, 05/23/2017 to Fri, 05/26/2017
Building: 
Butterfield House
Floor: 
02
Space: 
217
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Butterfield 217, Please have the Environmental Services unit removeglazing/caulking to assist with glass repair/replacement in Butterfield,residence hall, room 217. Please contact Herm Eichstaedt at 695-0557 tocoordinate and schedule this work. Upon completion, please notify JoshBurton and Herm Eichstaedt via email. Please use speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-Butterfield 217, Please have the Environmental Services unit removeglazing/caulking to assist with glass repair/replacement in Butterfield,residence hall, room 217. Please contact Herm Eichstaedt at 695-0557 tocoordinate and schedule this work. Upon completion, please notify JoshBurton and Herm Eichstaedt via email. Please use speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914, ,
 
 
Leach 224 - remove glazing/caulking

Leach 224 - remove glazing/caulking

Work Task ID: 
17-100851469
Dates: 
Tue, 05/23/2017 to Fri, 05/26/2017
Building: 
Leach House
Floor: 
02
Space: 
224
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Leach 224, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Leach ResidenceHall, room 224. Please contact Herm Eichstaedt at 413-695-0557 to coordinateand schedule this work. Upon completion, please use speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914,
 
 
Middlesex and Bartlett: Moving Services to move...

Middlesex and Bartlett: Moving Services to move PBS from Middlesex

Work Task ID: 
17-100852473
Dates: 
Tue, 05/23/2017 to Fri, 06/02/2017
Building: 
Middlesex House
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Middlesex and Bartlett. Moving Services to move PBS from Middlesex 113, 117, 122, 123, 124, 126, 127, 301, 302, 303, 304, 305, 306, 607, 309, 311, 321 to Bartlett 7A, 7B, 7C, 7D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 on June 1 & 2. Req: Liz Tousignant.CP Project: Middlesex and Hampshire House, CCPH and PBS Relocation - 1011837.PM/Phone: Doug Marshall 5-1383.ST#: 160357.Please roll any additional Work Tasks up to WT# 16-100807750.
»
 
bartlett 73, 15B, 19, 69, 81, 83, 7C, broken...

bartlett 73, 15B, 19, 69, 81, 83, 7C, broken asbestos floor tiles

Work Task ID: 
17-100853454
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Bartlett Hall
Requested For: 
Joseph Galica Sr
Status: 
Open
Description: 
bartlett 73, 15B, 19, 69, 81, 83, 7C, broken ASBESTOS floor tiles, joe galica, Email:jmgalica@facil.umass.edu, Phone: 577-1936,AHR - POS - Asbestos
»
Bartlett, Custodial 7, 11, 15, 69-85

Bartlett, Custodial 7, 11, 15, 69-85

Work Task ID: 
17-100848777
Dates: 
Wed, 05/24/2017 to Fri, 05/26/2017
Building: 
Bartlett Hall
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Bartlett, Custodial 7, 11, 15, 69-85. Custodial to thoroughly clean offices and floors in Bartlett 7, 11, 15, 69-85 on May 24 - 26. Req: Liz Tousignant.CP Project: Middlesex and Hampshire House, CCPH and PBS Relocation - 1011837.PM: Marshall, Doug.ST#: 160357.Please roll any additional Work Tasks up to WT# 16-100807750.
 
 
Machmer Exterior

Machmer Exterior

Work Task ID: 
17-100853488
Dates: 
Wed, 05/24/2017 to Wed, 06/07/2017
Building: 
Machmer Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Machmer Exterior - Replace and Repair 4 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006162
»
Melville 0209 - remove glazing/caulking

Melville 0209 - remove glazing/caulking

Work Task ID: 
17-100851751
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Melville House
Floor: 
02
Space: 
209
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Melville 0209, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Melville, studentroom 209. Please contact Steve Coltman at 413-230-1568 to coordinate andschedule this work. Upon completion, please notify Josh Burton and SteveColtman via email that work is complete. Please use speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914,
»
Morrill I, Rm 199N - remove door

Morrill I, Rm 199N - remove door

Work Task ID: 
17-100853473
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Morrill Science Center I
Requested For: 
Craig Perrault
Status: 
Open
Description: 
Morrill I, Rm 199N. ESU added to Alterations to project to remove door. Alt Project: Morrill I, Rm 199N Hallway Door - 1012065.PM/Phone: Perrault, Craig 5-0600.ST#: 160743.Please roll any additional Work Tasks up to WT# 16-100825524.
»
Patterson 0238 - remove glazing/caulking

Patterson 0238 - remove glazing/caulking

Work Task ID: 
17-100851736
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Patterson House
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Patterson 0238, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Patterson,Apartment 238. There are three windows that require abatement due to holesthat were cut for air conditioners. Please contact Steve Coltman at413-230-1568 to coordinate and schedule this work. Upon completion, pleasenotify Josh Burton and Steve Coltman via email that the work is done. Pleaseuse speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914
»
Thompson - Exterior

Thompson - Exterior

Work Task ID: 
17-100853489
Dates: 
Wed, 05/24/2017 to Wed, 06/07/2017
Building: 
Thompson Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Thompson - Exterior - 3 Outlets repair / Replace REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006162
»
 
Bartlett - Exterior

Bartlett - Exterior

Work Task ID: 
17-100853491
Dates: 
Thu, 05/25/2017 to Thu, 06/08/2017
Building: 
Bartlett Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Bartlett - Exterior - Replace / Repair 4 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006164
»
Goodell - Exterior

Goodell - Exterior

Work Task ID: 
17-100853490
Dates: 
Thu, 05/25/2017 to Thu, 06/08/2017
Building: 
Goodell Building
Requested For: 
Alan Dery
Status: 
Open
Description: 
Goodell - Exterior - Repair/Replace 2 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006163
»
Pierpont 0458 - remove glazing/caulking

Pierpont 0458 - remove glazing/caulking

Work Task ID: 
17-100852542
Dates: 
Thu, 05/25/2017 to Wed, 05/31/2017
Building: 
Pierpont House
Floor: 
04
Space: 
458
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Pierpont 0458, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Pierpontresidence hall, room 458. Please contact Herm Eichstaedt at 413-695-0557 tocoordinate and schedule this work. Upon completion, please notify HermEichstaedt and Josh Burton via email that the work is complete. *Please notethat there was a request for this job on 5/9/16, but we were informed that weneeded to resubmit it, because the request was too old*Thank you,, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914
»
Prince 0023 - remove glazing/caulking

Prince 0023 - remove glazing/caulking

Work Task ID: 
17-100853722
Dates: 
Thu, 05/25/2017 to Mon, 05/29/2017
Building: 
Prince House
Floor: 
B
Space: 
023
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Prince 0023, Please have the Environmental Services Unit removeglazing/caulking to assist with glass/repair/replacement in room 0023 ofPrince residence hall. Please contact Steve Coltman at 413-230-1568 tocoordinate and schedule this work. Upon completion, please notify JoshBurton and Steve Coltman via email. Please use speedtype 113119.Thank you,, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914,
»
Thompson 10 & 20 move

Thompson 10 & 20 move

Work Task ID: 
17-100852249
Dates: 
Thu, 05/25/2017 to Fri, 06/02/2017
Building: 
Thompson Hall
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Please move bookshelves from Thompson 10 to storage area down the hall. Please clear out all surplus furniture prior to June 6 when two offices are being moved into Thompson 10 & 20 from Middlesex. Thank you. REQ: Liz Tousignant
»
Thompson 827 & 1012 - Carpenter

Thompson 827 & 1012 - Carpenter

Work Task ID: 
17-100852248
Dates: 
Thu, 05/25/2017 to Fri, 06/02/2017
Building: 
Thompson Hall
Floor: 
08
Space: 
821
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Thompson 827 & 1012 - please install 4 desks in each room. This needs to happen before June 5th. Desks will be moved from room 821 to 827 and 1012 on May 24. REQ: Gina Patterson/5-4062AHR - NEG. DM.
»
 
DICKINSON ID # 1223 CONTROLS TECH NEEDED

DICKINSON ID # 1223 CONTROLS TECH NEEDED

Work Task ID: 
17-100850282
Dates: 
Fri, 05/26/2017
Building: 
Dickinson Hall
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
DICKINSON ID # 1223 CONTROLS TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
DICKINSON ID # 1223 GEN TECH NEEDED

DICKINSON ID # 1223 GEN TECH NEEDED

Work Task ID: 
17-100850281
Dates: 
Fri, 05/26/2017
Building: 
Dickinson Hall
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
DICKINSON ID # 1223 GEN TECH NEEDED REQ,- AL OHLSON @ 4136584270
 
DICKINSON ID #1223 ZONE ELECTRICIAN NEEDED

DICKINSON ID #1223 ZONE ELECTRICIAN NEEDED

Work Task ID: 
17-100850279
Dates: 
Fri, 05/26/2017
Building: 
Dickinson Hall
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
DICKINSON ID #1223 ZONE ELECTRICIAN NEEDED REQ.- AL OHLSON @ 4136584270
 
DICKINSON ID#1223 FASS TECH NEEDED

DICKINSON ID#1223 FASS TECH NEEDED

Work Task ID: 
17-100850280
Dates: 
Fri, 05/26/2017
Building: 
Dickinson Hall
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
DICKINSON ID#1223 FASS TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
ELAB 2 ID # 1221 GEN TECH NEEDED

ELAB 2 ID # 1221 GEN TECH NEEDED

Work Task ID: 
17-100850277
Dates: 
Fri, 05/26/2017
Building: 
Engineering Laboratory II
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
ELAB 2 ID # 1221 GEN TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
ELAB2 ID # 1221 ZONE ELECTRICIAN NEEDED

ELAB2 ID # 1221 ZONE ELECTRICIAN NEEDED

Work Task ID: 
17-100850275
Dates: 
Fri, 05/26/2017
Building: 
Engineering Laboratory II
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
ELAB2 ID # 1221 ZONE ELECTRICIAN NEEDED REQ.- AL OHLSON @ 4136584270
 
ELAB2 ID #1221 CONTROLS TECH NEEDED

ELAB2 ID #1221 CONTROLS TECH NEEDED

Work Task ID: 
17-100850278
Dates: 
Fri, 05/26/2017
Building: 
Engineering Laboratory II
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
ELAB2 ID #1221 CONTROLS TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
ELAB2 ID# 1221 FASS TECH NEEDED

ELAB2 ID# 1221 FASS TECH NEEDED

Work Task ID: 
17-100850276
Dates: 
Fri, 05/26/2017
Building: 
Engineering Laboratory II
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
ELAB2 ID# 1221 FASS TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
CHP – Need to investigate water leak on Boiler #...

CHP – Need to investigate water leak on Boiler #200 desuperheater line.

Work Task ID: 
17-100849919
Dates: 
Sat, 05/27/2017
Building: 
Central Heating Plant
Requested For: 
Steven Lemay
Status: 
Open
Description: 
CHP – Need to investigate water leak on Boiler #200 desuperheater line.
 
28
29
30
31
1
2
3
«
Alt Secondary WT: Lederle GRC, Physics High...

Alt Secondary WT: Lederle GRC, Physics High Energy NFH - REQ 54167

Work Task ID: 
17-100842797
Dates: 
Thu, 01/05/2017 to Fri, 12/29/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Lederle GRC, Physics High Energy New Hire - REQ 54167 Scope: LGRT Ofc 928 & north half for Lab 927. Renovations budget of <$20. No chemical work in lab. Due to timing, much of renovations happen in same space ahead of this hire under 2016 hire Hertel. Detailed scope by DCM TBD. No work to start until final candidate hired. Date to begin design or Alterations work around January 2017. Expect hire on campus 9/2018. Peter Gray-Mullen as AD, Gatean Blais as PM, Betsy Blunt as support, Alt PM: Mike Aldrich.
»
 
 
 
«
Arnold 429 - moving services

Arnold 429 - moving services

Work Task ID: 
17-100851945
Dates: 
Mon, 05/22/2017 to Tue, 05/30/2017
Building: 
Arnold House
Floor: 
04
Space: 
429
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Arnold 429 - Moving services - please center furniture on 5/22 as best as possible for paint. Return furniture on 4/30. REQ: Liz Tousignant/7-0413 **NOTE: Room is just to the left when you get off the elevator, not in room number order**
 
CHC East - 5/31/17 - Custodial Support

CHC East - 5/31/17 - Custodial Support

Work Task ID: 
17-100848019
Dates: 
Wed, 05/31/2017 to Thu, 06/01/2017
Building: 
Commonwealth Honors College
Floor: 
01
Space: 
160
Requested For: 
Michael Dodge
Status: 
Open
Description: 
CHC Events Hall East, Residential Life, RELI 2017 Conference Start Time: 05/31/2017 at 8:00 am End Time: 05/31/2017 at 10:00 pm Est. # Participants: 45 Room Setup Style: HorseshoeSetup Time: 05/31/2017 at 7:00 amBreakdown Time: 05/31/2017 at 10:00 pmAdditional Setup & Services: TablesDescription of Event Needs:Req. Michael Dodge at 5-0425, mtdodge@umass.eduSpeedtype:
»
«
bartlett 73, 15B, 19, 69, 81, 83, 7C, broken...

bartlett 73, 15B, 19, 69, 81, 83, 7C, broken asbestos floor tiles

Work Task ID: 
17-100853454
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Bartlett Hall
Requested For: 
Joseph Galica Sr
Status: 
Open
Description: 
bartlett 73, 15B, 19, 69, 81, 83, 7C, broken ASBESTOS floor tiles, joe galica, Email:jmgalica@facil.umass.edu, Phone: 577-1936,AHR - POS - Asbestos
 
CHC E&W - 5/30/17 - Custodial Support

CHC E&W - 5/30/17 - Custodial Support

Work Task ID: 
17-100848016
Dates: 
Tue, 05/30/2017 to Wed, 05/31/2017
Building: 
Commonwealth Honors College
Floor: 
01
Space: 
160
Requested For: 
Michael Dodge
Status: 
Open
Description: 
CHC Events Hall Both Sides, Residential Life, RELI 2017 Conference Start Time: 05/30/2017 at 8:00 am End Time: 05/30/2017 at 10:00 pm Est. # Participants: 45 Room Setup Style: HorseshoeSetup Time: 05/30/2017 at 7:00 amBreakdown Time: 05/30/2017 at 10:00 pmAdditional Setup & Services: TablesDescription of Event Needs:Req. Michael Dodge at 5-0425, mtdodge@umass.eduSpeedtype:
 
«
Bartlett - Custodial

Bartlett - Custodial

Work Task ID: 
17-100852330
Dates: 
Tue, 05/23/2017 to Thu, 06/01/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett, Rms 07A, 07B, 07C, 07D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 and basement. Request assistance for custodial staff in Bartlett in cleaning and waxing floors for new occupants in Bartlett basement, rooms 07A, 07B, 07C, 07D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 before June 1 move-in date. (Customer was told by custodian Jeff that he needed help to complete.) CP Project: Middlesex and Hampshire House, CCPH and PBS Relocation - 1011837.PM/Phone: Marshall, Doug 5-1383.ST#: 160357.Please roll any additional Work Tasks up to WT# 16-100807750.
»
«
Bartlett - Exterior

Bartlett - Exterior

Work Task ID: 
17-100853491
Dates: 
Thu, 05/25/2017 to Thu, 06/08/2017
Building: 
Bartlett Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Bartlett - Exterior - Replace / Repair 4 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006164
»
«
Bartlett EO&D Spaces. Request Carpenter

Bartlett EO&D Spaces. Request Carpenter

Work Task ID: 
17-100850975
Dates: 
Mon, 05/08/2017 to Sun, 06/11/2017
Building: 
Bartlett Hall
Requested For: 
Douglas Marshall
Status: 
Open
Description: 
Bartlett EO&D Spaces. Request carpenter (with ESU assistance as required) to perform the tasks (see Notes and Docs tab for full scope) in Bartlett Hall, preferably before June 12, when service contract painting is likely to begin. CP Project: Campus, CICS Accommodations - 1013481.PM: Marshall, Doug.
»
«
Bowditch Lodge: Wall repair needed

Bowditch Lodge: Wall repair needed

Work Task ID: 
17-100852399
Dates: 
Tue, 05/23/2017 to Tue, 06/06/2017
Building: 
Bowditch Lodge
Requested For: 
Teresa Houle
Status: 
Open
Description: 
Bowditch Lodge: The wall in the lower level restroom is pretty beat. Could the rust-colored spots be touched up with paint? A new panel would be great but I'm not sure that's possible as it would restrict access. Any work that can be done to improve the look would be appreciated. See attached photos. Req: Teresa Houle / 5-1566
»
«
Boyden Gym Room 169 Women's Shower

Boyden Gym Room 169 Women's Shower

Work Task ID: 
17-100840903
Dates: 
Wed, 07/17/2013 to Fri, 07/21/2017
Building: 
Boyden Gymnasium
Floor: 
01
Space: 
169
Requested For: 
David Wilson
Status: 
Open
Description: 
Boyden Gym Room 169 Women's Shower - Plaster ceiling falling down REQ: David Wilson dmwil0@facil.umass.edu 545-4227 E-002710AHR - NEG. DM. (1012995)
»
«
CHC E&W - 5/21/17 - Custodial Support

CHC E&W - 5/21/17 - Custodial Support

Work Task ID: 
17-100838841
Dates: 
Sun, 05/21/2017 to Sat, 08/05/2017
Building: 
Commonwealth Honors College
Floor: 
01
Space: 
160
Requested For: 
Erin O'Rourke
Status: 
Open
Description: 
CHC Events Hall, Summer Programs, Summer Pre-College programming Start Time: 05/21/2017 at 9:00 am End Time: 08/05/2017 at 9:00 am Est. # Participants: 100 Room Setup Style: Audience/Lecture StyleSetup Time: 05/21/2017 at 9:00 amBreakdown Time: 08/05/2017 at 9:00 amAdditional Setup & Services:Description of Event Needs: Reservation request is for every Sun & Wed evening between 5/21 and 8/5, from 2 - 9:30pm.For these 3 dates we will need audience-style seating, as many seats as possible, with no divider wall: 6/25, 7/9 & 7/23.All other dates will require standard setup for casual events.Dates:May 21, 24, 28, 31June 4, 7, 11, 14, 18, 21, 25, 28July 2, 5, 9, 12, 16, 19, 23, 26, 30August 2Number of participants varies depending on the day.Req. Erin O'Rourke at 577-2112, eorourke@umass.eduSpeedtype: 158951
»
«
Cold Spring Orchard - Construction Services

Cold Spring Orchard - Construction Services

Work Task ID: 
17-100851942
Dates: 
Thu, 05/18/2017 to Mon, 07/31/2017
Building: 
Chandler Laboratory
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Cold Spring Orchard - Construction Services to support Utility Maintenance to replace a failed water line. REQ: Pam Monn/5-1270 & Tom Fydenkevez/5-6444
»
«
Conte, Rm B642 Cabinet

Conte, Rm B642 Cabinet

Work Task ID: 
16-100706736
Dates: 
Sat, 04/29/2017 to Mon, 07/10/2017
Building: 
Conte Polymer Research Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Conte Polymer Research B642, The cabinet under the second sink from the door needs to be replaced. There was a fire accident 4 years ago and the cabinet was never replaced. REQ: George Chang, Email: cchang90@research.umass.edu, Phone: 4136953558 AHR NEG (this was originally WT672550 for Zone 1. John L. suggested this work go to Alterations - njm)
»
«
DuBOIS LIBRARY - plumber

DuBOIS LIBRARY - plumber

Work Task ID: 
17-100851756
Dates: 
Tue, 05/16/2017 to Tue, 05/30/2017
Building: 
DuBois Library
Requested For: 
Scott Ames
Status: 
Open
Description: 
DuBOIS LIBRARY - BASEMENT - DuBOIS LIBRARY, HV-2,INNER SUB BSMNT, N.E.CORNER, overheating.req.scott@56416
 
 
«
Flint 204B: Moving Services Needed

Flint 204B: Moving Services Needed

Work Task ID: 
17-100851323
Dates: 
Fri, 05/19/2017 to Tue, 05/30/2017
Building: 
Flint Laboratory
Floor: 
02
Space: 
204B
Requested For: 
Rebecca Chmura
Status: 
Open
Description: 
Flint 204B: Please move desk in office away from the wall to allow painters access to the area in need of work but leave it accessible as occupant will work during week painting occurs. Please move desk on Friday, May 19th and put it back against the wall on Tuesday, May 30th. Req: Sarah Long / 7-4770
 
 
«
Goessmann, Rms 162 and 114 Office 259A NFH: Alt...

Goessmann, Rms 162 and 114 Office 259A NFH: Alt Secondary WT

Work Task ID: 
17-100842787
Dates: 
Wed, 03/29/2017 to Sun, 10/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Alt Secondary: Complete a modest renovation to Room 162 and 114 for a chemical engineering new hire Lauren Woodruff. The goal would be to complete this work by the end of calendar year 2016. The new hire will use Room 162 as main lab and 114 for tissue culture and office. Anticipated start date of Jan 22, 2017. Budget target is $100-150k but not reviewed by Alterations. Minimizing costs remains a priority.
»
«
Goodell - Exterior

Goodell - Exterior

Work Task ID: 
17-100853490
Dates: 
Thu, 05/25/2017 to Thu, 06/08/2017
Building: 
Goodell Building
Requested For: 
Alan Dery
Status: 
Open
Description: 
Goodell - Exterior - Repair/Replace 2 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006163
»
«
Hadley Farm, North and South Sheds Support Beams...

Hadley Farm, North and South Sheds Support Beams and Roofs

Work Task ID: 
16-100728395
Dates: 
Sun, 04/10/2016 to Tue, 08/15/2017
Building: 
Hadley Farm Animal Agricultural Education Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hadley farm-North shed west side, need to have two support beams replaced., Gene Duda, Email: rduda@vasci.umass.edu, Phone: 237-3375 8/11/16 Scope added per Larry Merola from SR 1008965 which has been cancelled. Hadley Farm. North and South Sheds. Roofs had a rating of 25 yrs and it's been 40 yrs. Please investigate replacement of shingles on north and south sheds. The roofs are beginning to be fail. REQ: Gene Duda, rduda@vasci.umass.edu, 413.237.3375 Project name has been changed from Hadley Farm, North Shed Support Beams to Hadley Farm, North and South Sheds Support Beams and Roofs.
»
«
Hasbrouck, Rms 201, 201A, 202, 204 and 206...

Hasbrouck, Rms 201, 201A, 202, 204 and 206 Teaching Lab Renovations

Work Task ID: 
16-100767901
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Hasbrouck, Rms 201, 201A, 202, 204, 206, Physics Teaching Lab Reno - Remove wall between 204 & 206, add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall between 201 and 202. add receptacles, white boards, paint, replace 1 sink unit. remove side wall benches, remove tables, add floor outlets to connect tables, add projection equipment, replace lighting and add dimmer switch, add cubbies and coat hooks, replace doors, fix air system. Remove wall structure around 201A and finish the back wall at 201/202. This renovation needs to be done summer 2017 and is a copy of what we did with Alterations in the summer of 2016., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Isenberg School of Management, Alfond Hall, Mahar...

Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - SIN support

Work Task ID: 
17-100849249
Dates: 
Thu, 05/18/2017 to Thu, 08/31/2017
Building: 
Isenberg School of Management Building
Requested For: 
Stephen Lobik
Status: 
Open
Description: 
Isenberg School of Management, Alfond Hall, Mahar Auditorium mech rooms - Zone 5 SIN support 05/18/2017 8am - 08/31/2017 8am. Zone plumber to hut off steam valves in the mechanical rooms of the 3 buildings. Open valves at the end of the shutdown. Shutoff low pressure steam within each building to allow for demolition of existing service and equipment. Areas will be modified and prepared for new equipment and steam service being installed under this project. Because steam to HVAC reheat coils will be off Alfond and ISOM may experience colder air temperatures than normal. Hot water at toilet room sinks will also be impacted. Contact Stephen Lobik 413-326-1651 for additional information.
»
«
Lincoln CC, Blue Wall Equipment Install

Lincoln CC, Blue Wall Equipment Install

Work Task ID: 
17-100840326
Dates: 
Mon, 04/03/2017 to Mon, 08/28/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Blue Wall Equipment Install - Install new kitchen equipment Remove and cap steam line. PM: Mike Aldrich Client: Don Lamothe
»
«
Lincoln CC, Harvest Market Equipment Installation

Lincoln CC, Harvest Market Equipment Installation

Work Task ID: 
17-100826573
Dates: 
Mon, 02/06/2017 to Tue, 08/01/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Lincoln CC, Harvest Equipment InstallationScope: Provide electrical for new equipment.PM: Mike AldrichClient: Don Lamothe
»
«
Lincoln CC, Rm 913 HVAC

Lincoln CC, Rm 913 HVAC

Work Task ID: 
16-100690435
Dates: 
Sun, 01/15/2017 to Mon, 06/19/2017
Building: 
Lincoln Campus Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center 913, HVAC engineering design and work required. There is now DAS (Verizon project) equipment in this closet with no ventilation causing the closet to overheat. Please contact Marcin Celmer with questions and for access., Marcin Celmer, Email: marcin.celmer@umass.edu, Phone: 5-3096
»
«
Lincoln CC, U Store Renew

Lincoln CC, U Store Renew

Work Task ID: 
16-100805543
Dates: 
Thu, 12/22/2016 to Mon, 07/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Campus Center U-Store 201, Move counters for Electronics and install ceiling tiles for U-Store upgrade. Attention Mike Aldrich. This is for UESINeed a PBE estimate for funding., Donald Lamothe, Email: dlamothe@umass.edu,Phone: 577-8218
»
«
LSL, Various Mech Rooms - Reprogram Fire Alarm...

LSL, Various Mech Rooms - Reprogram Fire Alarm Control Panel

Work Task ID: 
17-100852224
Dates: 
Mon, 05/22/2017 to Mon, 06/05/2017
Building: 
Life Science Laboratories
Requested For: 
Andrew Thibault
Status: 
Open
Description: 
Life Sciences Laboratory Various Mechanical Rooms, Reprogram Fire Alarm Control Panel so that when Preaction Systems #1, #2, #3, #4 and #6 are activated they cause an Alarm signal at the FACP. Preaction systems #1 - #3currently come in as a Supervisory signal when activated while #4 and #6 do not register when activated. Assign to Outside Mechanical Contractor - Simplex Grinnell.Contact: P. Volpe (413) 687-1223, Peter Volpe, Email: pvolpe@facil.umass.edu,Phone: (413) 687-1223,
»
«
Machmer Exterior

Machmer Exterior

Work Task ID: 
17-100853488
Dates: 
Wed, 05/24/2017 to Wed, 06/07/2017
Building: 
Machmer Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Machmer Exterior - Replace and Repair 4 outlets REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006162
»
«
Marcus, Rm 131 Auditorium

Marcus, Rm 131 Auditorium

Work Task ID: 
15-100504614
Dates: 
Sun, 05/15/2016 to Fri, 06/30/2017
Building: 
Marcus Hall
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
MARCUS 131 auditorium. renovation project for alterations on 'classroom funding'. to include but not limited to: lighting, chairs, floors.... per dan mccarthy Bill Lizotte lights - Support PM
»
«
Mather - Moving Services Needed

Mather - Moving Services Needed

Work Task ID: 
17-100828925
Dates: 
Mon, 02/06/2017 to Fri, 06/09/2017
Building: 
Mather Building
Requested For: 
Desiree Roff
Status: 
Open
Description: 
Mather: Moving needed in support of carpet/paint project in Feb-June. 2/6 – Move contents of 119 & 119A into 101A 2/20 – Move contents of 102 back to 119 & 119A. Move contents of 122 & 122A into 101A 3/6 – Move contents of 102 back to 122 & 122A. Move contents of 120 & 121 into 101A 3/20 – Move contents of 102 back to 120 & 121. Move contents of 110 & 113 into 101A 4/3 – Move contents of 102 back to 110 & 113. Move contents of 114 & 115 into 101A 4/17 – Move contents of 102 back into 114 & 115. Move contents of 102 & 102B into 101A 5/1 – Move contents of 101A back into 102 & 102B. 5/22 – Move contents of room 200 into 101A. 6/9 – Move contents of 101A back into 200. On-site contact is Desiree Roff / 5-3930
»
«
Melville 0209 - remove glazing/caulking

Melville 0209 - remove glazing/caulking

Work Task ID: 
17-100851751
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Melville House
Floor: 
02
Space: 
209
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Melville 0209, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Melville, studentroom 209. Please contact Steve Coltman at 413-230-1568 to coordinate andschedule this work. Upon completion, please notify Josh Burton and SteveColtman via email that work is complete. Please use speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914,
 
Furcolo North Side Courtyard - repair

Furcolo North Side Courtyard - repair

Work Task ID: 
16-100768623
Dates: 
Tue, 05/30/2017 to Fri, 06/30/2017
Building: 
Furcolo Hall
Requested For: 
Jennifer Masztal
Status: 
Open
Description: 
Furcolo North Side Courtyard: Please repair concrete, do landscaping on overgrown area, and install picnic table. Photos attached in notes/docs. Req: Jennifer Masztal / 5-0897**Waiting on funding. See Pam Monn for details.**
»
«
Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Memorial Hall, Rms 5, 8, 9, 20 Epoxy Floor

Work Task ID: 
16-100766005
Dates: 
Sun, 06/12/2016 to Sat, 08/12/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Memorial Hall. Rms 5, 8, 9, 20 and corridor. Due to a recent overflow the carpet has come loose and seriosly wrinkled. These wrinkles pose a trip hazard. Please replace carpet with epoxy. January winter session or july would be best to replace the carpet. thanks Krislyn Lequin klequin@admin.umass.edusee notes/docsAHR - POS. DM. Asbestos black mastic is present in room 14, 16, 17, and the corners and edges of the hall way.
»
«
Middlesex and Bartlett: Moving Services to move...

Middlesex and Bartlett: Moving Services to move PBS from Middlesex

Work Task ID: 
17-100852473
Dates: 
Tue, 05/23/2017 to Fri, 06/02/2017
Building: 
Middlesex House
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Middlesex and Bartlett. Moving Services to move PBS from Middlesex 113, 117, 122, 123, 124, 126, 127, 301, 302, 303, 304, 305, 306, 607, 309, 311, 321 to Bartlett 7A, 7B, 7C, 7D, 11A, 11B, 11C, 11D, 11E, 15B, 17, 69, 71, 73, 75, 77, 79, 81, 83 on June 1 & 2. Req: Liz Tousignant.CP Project: Middlesex and Hampshire House, CCPH and PBS Relocation - 1011837.PM/Phone: Doug Marshall 5-1383.ST#: 160357.Please roll any additional Work Tasks up to WT# 16-100807750.
»
«
Morrill I, Rm 199N - remove door

Morrill I, Rm 199N - remove door

Work Task ID: 
17-100853473
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Morrill Science Center I
Requested For: 
Craig Perrault
Status: 
Open
Description: 
Morrill I, Rm 199N. ESU added to Alterations to project to remove door. Alt Project: Morrill I, Rm 199N Hallway Door - 1012065.PM/Phone: Perrault, Craig 5-0600.ST#: 160743.Please roll any additional Work Tasks up to WT# 16-100825524.
 
Marching Band building - 5/31/17 - Moving

Marching Band building - 5/31/17 - Moving

Work Task ID: 
17-100853692
Dates: 
Tue, 05/30/2017 to Mon, 06/05/2017
Building: 
Parks, George N. Minuteman Marching Band Building
Requested For: 
Eliza Frasier
Status: 
Open
Description: 
GN Parks Building Big Practice Room, Minuteman Marching Band, CBDNA Symposium Start Time: 05/30/2017 at 5:00 pm End Time: 06/03/2017 at 5:00 pm Est. # Participants: 150 Room Setup Style: We will have tables placed along wall to the right and along mirrored wallSetup Time: 05/30/2017 at 10:00 amBreakdown Time: 06/03/2017 at 5:00 pmAdditional Setup & Services: TablesDescription of Event Needs: We would like to request 12 tables for the duration of our event.Req. Eliza Frasier at 5-3410, esummers@umass.eduSpeedtype: 119383
»
«
Morrill IV, Rm N303 Teaching Lab Renovation

Morrill IV, Rm N303 Teaching Lab Renovation

Work Task ID: 
16-100767902
Dates: 
Mon, 05/08/2017 to Mon, 01/22/2018
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Morrill 4, N303, Teaching Lab Renovation - Please replace floor, paint walls, replace lighting, add troph sinks at either end of room, backflow preventer may have to move, enclose the compressor outside the cold room, add white boards, projection and podium, replace lab benchs. This renovation is a continuation of the renovation we did in the summer of 2016 of teaching lab 301 and needs to be done in the summer of 2017., Patricia Cromack, Email: pcromack@cns.umass.edu, Phone: 5-5913,
»
«
Patterson 0238 - remove glazing/caulking

Patterson 0238 - remove glazing/caulking

Work Task ID: 
17-100851736
Dates: 
Wed, 05/24/2017 to Mon, 05/29/2017
Building: 
Patterson House
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Patterson 0238, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Patterson,Apartment 238. There are three windows that require abatement due to holesthat were cut for air conditioners. Please contact Steve Coltman at413-230-1568 to coordinate and schedule this work. Upon completion, pleasenotify Josh Burton and Steve Coltman via email that the work is done. Pleaseuse speedtype 113119.Thank you, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914
 
Thompson 10 & 20 - Custodial

Thompson 10 & 20 - Custodial

Work Task ID: 
17-100852146
Dates: 
Tue, 05/30/2017 to Fri, 06/02/2017
Building: 
Thompson Hall
Requested For: 
Pamela Rooney
Status: 
Open
Description: 
Thompson 10 & 20 (lowrise basement) - Please clean offices, including wiping down all surfaces, wash windows, strip and wax floors if feasible in prep for new occupants (moving in June 6). This should happen the week of May 30 as the old occupants will not be vacated until end of the day on May 26. REQ: Liz Tousignant/7-0413
»
«
Physical Plant, Central Stores Office Build Out

Physical Plant, Central Stores Office Build Out

Work Task ID: 
17-100840363
Dates: 
Wed, 03/08/2017 to Mon, 07/03/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Physical Plant, Central Stores Office Build Out - Central Stores, Please send to Alterations. Need quote tobuild out offices., Larry, Email: lsnyder@admin.umass.edu, Phone: 5458000
»
«
Pierpont 0458 - remove glazing/caulking

Pierpont 0458 - remove glazing/caulking

Work Task ID: 
17-100852542
Dates: 
Thu, 05/25/2017 to Wed, 05/31/2017
Building: 
Pierpont House
Floor: 
04
Space: 
458
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Pierpont 0458, Please have the Environmental Services Unit removeglazing/caulking to assist with glass repair/replacement in Pierpontresidence hall, room 458. Please contact Herm Eichstaedt at 413-695-0557 tocoordinate and schedule this work. Upon completion, please notify HermEichstaedt and Josh Burton via email that the work is complete. *Please notethat there was a request for this job on 5/9/16, but we were informed that weneeded to resubmit it, because the request was too old*Thank you,, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914
 
«
Prince 0023 - remove glazing/caulking

Prince 0023 - remove glazing/caulking

Work Task ID: 
17-100853722
Dates: 
Thu, 05/25/2017 to Mon, 05/29/2017
Building: 
Prince House
Floor: 
B
Space: 
023
Requested For: 
Joshua Burton
Status: 
Open
Description: 
Prince 0023, Please have the Environmental Services Unit removeglazing/caulking to assist with glass/repair/replacement in room 0023 ofPrince residence hall. Please contact Steve Coltman at 413-230-1568 tocoordinate and schedule this work. Upon completion, please notify JoshBurton and Steve Coltman via email. Please use speedtype 113119.Thank you,, Joshua Burton, Email: jjburton@umass.edu, Phone: 413-545-6914,
 
 
 
«
Recycling Facility Barn, South Side Entry Steps

Recycling Facility Barn, South Side Entry Steps

Work Task ID: 
16-100725628
Dates: 
Mon, 04/17/2017 to Wed, 05/31/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Waste Management Barn Wooden steps on the back side (south-side), These steps are degrading and a hazard. If they cannot be completely replaced at this time, please perform the following work as an immediate measure: Replace the bottom step, and the first board of the top landing -- the edges of these are crumbling and rotten. This is the only entrance on that side (with steps) -- the overhead door entrances are for the trucks. Please contact the Physical Plant Safety Office at 545-4192 if more details are needed. Thank you., Sondra Slesinski, Email: sslesins@ehs.umass.edu, Phone: 413-545-4192Per Larry Merola. UMAPP Alterations to investigate and evaluate the work area to determine the scope of work and as necessary apply for permit(s). = Appears to be on the PEB (Barn) and is not in the scope of work for our Recycling Trailer project.
 
«
Stockbridge House, Gutter

Stockbridge House, Gutter

Work Task ID: 
16-100690437
Dates: 
Tue, 01/12/2016 to Fri, 06/16/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Stockbridge House. (University Club). Please patch/enclose area of roof/gutter where rodents often nest. (see pic). REQ: Valerie Maurer, vmaurer@umass.edu, 7-8114
»
«
Stockbridge, back side of Stockbridge (North),...

Stockbridge, back side of Stockbridge (North), outside install gravel

Work Task ID: 
17-100848555
Dates: 
Fri, 04/21/2017 to Mon, 07/31/2017
Building: 
Stockbridge Hall
Requested For: 
Daniel Poirier
Status: 
Open
Description: 
Stockbridge, back side of Stockbridge (North), outside. To prevent water from seeping into rms 15, 17, and 40; please pitch dirt from basement windows down to sidewalk, install gravel to pitch toward sidewalk. (SEE PICS attached) See Dan Poirer for more specifics. REQ: Dan Poirier, dpoirier@facil.umass.edu, 413.362.9932.
»
«
Thompson - Exterior

Thompson - Exterior

Work Task ID: 
17-100853489
Dates: 
Wed, 05/24/2017 to Wed, 06/07/2017
Building: 
Thompson Hall
Requested For: 
Alan Dery
Status: 
Open
Description: 
Thompson - Exterior - 3 Outlets repair / Replace REQ: Dery, Alan-10186028_0 adery@umass.edu 467-6809 C-006162
»
«
Thompson 10 & 20 move

Thompson 10 & 20 move

Work Task ID: 
17-100852249
Dates: 
Thu, 05/25/2017 to Fri, 06/02/2017
Building: 
Thompson Hall
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Please move bookshelves from Thompson 10 to storage area down the hall. Please clear out all surplus furniture prior to June 6 when two offices are being moved into Thompson 10 & 20 from Middlesex. Thank you. REQ: Liz Tousignant
»
«
Thompson 827 & 1012 - Carpenter

Thompson 827 & 1012 - Carpenter

Work Task ID: 
17-100852248
Dates: 
Thu, 05/25/2017 to Fri, 06/02/2017
Building: 
Thompson Hall
Floor: 
08
Space: 
821
Requested For: 
Elizabeth Tousignant
Status: 
Open
Description: 
Thompson 827 & 1012 - please install 4 desks in each room. This needs to happen before June 5th. Desks will be moved from room 821 to 827 and 1012 on May 24. REQ: Gina Patterson/5-4062AHR - NEG. DM.
»
«
UHC, Entrance Flooring

UHC, Entrance Flooring

Work Task ID: 
16-100702054
Dates: 
Wed, 01/27/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS Ground floor entrance, Please remove glued-down floor mat that is in the vestibule between the outer and inner ground floor door. If this requires an asbestos abatement, please remove the underlying tile and replace it with the same tileas the rest of the ground floor.can this be done over the january break along with the other flooring projects? , Linda Rotondi , Email: lfr@uhs.umass.edu, Phone: 7- 5205AHR - POS - There is black asbestos mastic still under this carpet along the edges and all corners that should be removed by ESU before new material is installed.
»
«
UHC, Rms 10 & 351 Flooring

UHC, Rms 10 & 351 Flooring

Work Task ID: 
16-100714206
Dates: 
Tue, 03/08/2016 to Mon, 09/04/2017
Building: 
University Health Center
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
UHS 351, Replace carper t with vinyl tile. Requires asbestos abatment. Please include this in the big third floor carpet/ tile project that JJ Anliker will be doing this summer. About 180 square feet. Scope added from 1007777 UHS see below, Replace worn carpeting and pink tile floor in Specialty Clinic areas (room 10). About 1800 square feet. Can it be done this summer? , Linda Rotondi, Email: lfr@uhs.umass.edu, Phone: 577-5205
»
«
Waste Water Treatment Plant (Pilot Plant)- various

Waste Water Treatment Plant (Pilot Plant)- various

Work Task ID: 
17-100845128
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment Plant (Pilot Plant) - Construction Services support for the following:-Move bridge pieces-move loam-regrade-run pipe to Mill RiverREQ: Pam Monn/5-1270
 
«
Waste Water Treatment plant - Install picnic table

Waste Water Treatment plant - Install picnic table

Work Task ID: 
17-100845129
Dates: 
Fri, 04/07/2017 to Wed, 05/31/2017
Building: 
Waste Water Treatment Building
Requested For: 
Pamela Monn
Status: 
Open
Description: 
Waste Water Treatment (Pilot Plant) - pour pad and install campus standard picnic table. REQ: Pam Monn/5-1270
 
«
Whitmore 3rd floor - ESU support for project

Whitmore 3rd floor - ESU support for project

Work Task ID: 
17-100835416
Dates: 
Fri, 02/10/2017 to Wed, 05/31/2017
Building: 
Whitmore Hall
Requested For: 
Michael Aldrich
Status: 
Open
Description: 
Whitmore, Reconfigure Rms 330, 330A, 343, 347 & 349C - Add ESU to remove asbestos containing mastic, tile and wall panels. Work to be performed 2/11 - 2/12. A&F new hire
 
«
Whitmore, Rm 255 Renovation

Whitmore, Rm 255 Renovation

Work Task ID: 
16-100802364
Dates: 
Mon, 03/20/2017 to Mon, 09/18/2017
Building: 
Campus
Requested For: 
Workplace Operations User
Status: 
Open
Description: 
Whitmore 255, Would like an estimate to rebuild conference room walls we have in 255 to make it sound proof., Eva Zilinski, Email: ez@finaid.umass.edu, Phone: 545-0356
»
«
Whitmore, Rm 370 Mixing Box

Whitmore, Rm 370 Mixing Box

Work Task ID: 
17-100850203
Dates: 
Sat, 05/27/2017 to Tue, 05/30/2017
Building: 
Whitmore Hall
Requested For: 
Robert Perry
Status: 
Open
Description: 
Building: WhitmoreRoom: Rm 370 Mixing BoxScope: Add Rupert Clark to assist w/ this projectAlt Project: Whitmore, Rm 370 Mixing Box PM: Bob PerryST#: 160804Roll up to WT#: 17-100841681
 
Hampshire DC elevator - WT for FASS SIN support...

Hampshire DC elevator - WT for FASS SIN support 05/31/2017 8:30am

Work Task ID: 
17-100849254
Dates: 
Wed, 05/31/2017
Building: 
Hampshire Dining Hall
Requested For: 
Donald Chapdelaine
Status: 
Open
Description: 
Hampshire DC elevator - WT for FASS SIN support 05/31/2017 8:30am - 10:30am. FASS to test fire recall as part of annual elevator safety testing. Contact Don Chapdelaine 5-4813 for additional information.
 
PAIGE ID # 1225 CONTROLS TECH NEEDED

PAIGE ID # 1225 CONTROLS TECH NEEDED

Work Task ID: 
17-100850286
Dates: 
Wed, 05/31/2017
Building: 
Paige Laboratory
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
PAIGE ID # 1225 CONTROLS TECH NEEDED REQ,- AL OHLSON @ 4136584270
 
PAIGE ID #1225 GEN TECH NEEDED

PAIGE ID #1225 GEN TECH NEEDED

Work Task ID: 
17-100850285
Dates: 
Wed, 05/31/2017
Building: 
Paige Laboratory
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
PAIGE ID #1225 GEN TECH NEEDED REQ.- AL OHLSON @ 413684270
 
PAIGE ID #1225 ZONE ELECTRICIAN NEEDED

PAIGE ID #1225 ZONE ELECTRICIAN NEEDED

Work Task ID: 
17-100850283
Dates: 
Wed, 05/31/2017
Building: 
Paige Laboratory
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
PAIGE ID #1225 ZONE ELECTRICIAN NEEDED REQ.- AL OHLSON @ 4136584270
 
PAIGE ID#1225 FASS TECH NEEDED

PAIGE ID#1225 FASS TECH NEEDED

Work Task ID: 
17-100850284
Dates: 
Wed, 05/31/2017
Building: 
Paige Laboratory
Requested For: 
Alfred Ohlson
Status: 
Open
Description: 
PAIGE ID#1225 FASS TECH NEEDED REQ.- AL OHLSON @ 4136584270
 
Paige Lab elevator - WT for FASS SIN support 05/...

Paige Lab elevator - WT for FASS SIN support 05/31/2017 10:30am

Work Task ID: 
17-100849259
Dates: 
Wed, 05/31/2017
Building: 
Paige Laboratory
Requested For: 
Donald Chapdelaine
Status: 
Open
Description: 
Paige Lab elevator - WT for FASS SIN support 05/31/2017 10:30am - 12:30pm. FASS to test elevator fire recall as part of annual state elevator safety testing. Contact Don Chapdelaine 5-4813 for additional information.
 
 
 
Berkshire DC elevators - WT for FASS SIN support...

Berkshire DC elevators - WT for FASS SIN support 05/30/2017 8:30am

Work Task ID: 
17-100849252
Dates: 
Tue, 05/30/2017
Building: 
Berkshire Dining Hall
Requested For: 
Donald Chapdelaine
Status: 
Open
Description: 
Berkshire DC elevators - WT for FASS SIN support 05/30/2017 8:30am - 12:15pm. FASS to test fire recall. Annual state elevator safety testing. Contact Don Chapdeliane 5-4813 for additional information.
 
Berkshire DC elevators - WT for FASS SIN support...

Berkshire DC elevators - WT for FASS SIN support 05/30/2017 8:30am

Work Task ID: 
17-100849775
Dates: 
Tue, 05/30/2017
Building: 
Berkshire Dining Hall
Requested For: 
Donald Chapdelaine
Status: 
Open
Description: 
Berkshire DC elevators - WT for FASS SIN support 05/30/2017 8:30am - 12:15pm. FASS to test fire recall as part of the annual state elevator safety testing. Contact Don Chapdelaine 5-4813 for additional information.